基于多目標(biāo)布谷鳥算法的風(fēng)光水聯(lián)合調(diào)度研究
[Abstract]:With the wind and solar energy being connected to the power grid on a large scale, it has the characteristics of randomness and large force fluctuation, which brings a lot of new challenges to the power system. How to make efficient use of these new energy sources and reduce the impact on the power grid has attracted extensive attention from domestic and foreign scholars. Large-scale cascade hydropower station access system can not only provide sufficient power support for the system, but also make use of the advantages of its hydropower units to start and stop quickly and operate flexibly to meet the requirements of rapid peak shaving system, and lay the foundation for the access of new energy sources. However, cascade hydropower has complex coupling between upper and lower levels, which brings difficulties to modeling and solving. In conclusion, on the premise of considering the characteristics of various kinds of power supply, how to formulate reasonable multi-power scheduling strategy and find a suitable method to solve the complex model is an urgent problem to be solved. In this paper, wind power, photovoltaic, cascade hydropower stations as research object. First of all, the development status of each and the significance of joint dispatch of various kinds of power supply are described. Then, the algorithm of solving the existing scheduling model is studied, and an improved multi-objective cuckoo algorithm is proposed. The fuzzy decision model is used as the multi-objective decision method. Secondly, the multi-objective long-term operation model and the short-term combined operation model of wind, light and cascade hydropower stations are established respectively. Finally, an example is given to verify the accuracy and feasibility of the proposed algorithm and model. The result of example analysis shows that in the multi-objective optimal dispatching model of cascade hydropower stations, the model is solved by using the improved multi-objective cuckoo algorithm, aiming at the maximum annual output and the maximum guaranteed output of cascade hydropower stations. A set of non-inferior dispatching schemes with uniform distribution is obtained, a compromise solution is selected by fuzzy decision model, and the process of generating water for each hydropower station is obtained. Aiming at the minimum residual load peak and valley difference and the minimum residual load fluctuation, the results show that the introduction of cascade hydropower stations can effectively reduce the load peak and valley difference and make the process of remaining load allocated to other power sources as smooth as possible. In order to ensure the safe and economical operation of the power grid and power plant, improve the ability of the grid to accept new energy.
【學(xué)位授予單位】:西安理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TM73
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 韓冰;張粒子;舒雋;;梯級(jí)水電站代理競(jìng)價(jià)模型及均衡求解[J];中國(guó)電機(jī)工程學(xué)報(bào);2008年22期
2 延鳳茹;;承德縣灤河梯級(jí)水電站規(guī)劃及效益分析[J];中國(guó)水能及電氣化;2010年10期
3 陳巒;;滿發(fā)流量對(duì)梯級(jí)水電站發(fā)電量的影響[J];水力發(fā)電;2012年03期
4 張?jiān)c;;伏爾加河梯級(jí)水電站[J];電工技術(shù);1984年06期
5 鄧先禮;時(shí)滯對(duì)梯級(jí)水電站經(jīng)濟(jì)運(yùn)行的影響[J];重慶大學(xué)學(xué)報(bào)(自然科學(xué)版);1982年02期
6 ;龍~青段梯級(jí)水電站簡(jiǎn)要技術(shù)經(jīng)濟(jì)指標(biāo)表[J];西北水電技術(shù);1984年01期
7 ;貴州貓?zhí)犹菁?jí)水電站照片集錦[J];四川水力發(fā)電;1985年02期
8 魯子林;鐘平安;;梯級(jí)水電站參數(shù)優(yōu)選模型[J];河海大學(xué)學(xué)報(bào);1989年04期
9 黃光成;加強(qiáng)宏觀管理 開發(fā)水力資源——梯級(jí)水電站開發(fā)與管理研究成果披露[J];四川水力發(fā)電;1991年03期
10 魯子林;梯級(jí)水電站發(fā)電航運(yùn)優(yōu)化模型[J];水利學(xué)報(bào);1991年07期
相關(guān)會(huì)議論文 前10條
1 郭鵬慧;;黃河上游梯級(jí)電站調(diào)度監(jiān)控系統(tǒng)建設(shè)可行性研究[A];中國(guó)水利水電科學(xué)研究院自動(dòng)化所論文專集[C];2004年
2 費(fèi)如君;盧毓偉;周怡先;;梯級(jí)水電站短期優(yōu)化調(diào)度算法研究及軟件開發(fā)[A];2012全國(guó)水資源合理配置與優(yōu)化調(diào)度技術(shù)?痆C];2012年
3 繆益平;陳飛翔;戰(zhàn)永勝;魏鵬;;雅礱江梯級(jí)水電站集中管理探討[A];梯級(jí)調(diào)度控制研究論叢——2012年學(xué)術(shù)交流論文集(下冊(cè))[C];2014年
4 周民;王桂平;;黃河上游梯級(jí)水電站電力調(diào)度自動(dòng)化系統(tǒng)[A];2004年全國(guó)水電廠自動(dòng)化技術(shù)交流會(huì)論文[C];2004年
5 金澤華;劉春志;戴建煒;朱江;;以節(jié)能增效為核心的梯級(jí)水電站遠(yuǎn)程集中管理模式的探索與實(shí)踐[A];南方十三。ㄊ小^(qū))水電學(xué)會(huì)聯(lián)絡(luò)會(huì)暨學(xué)術(shù)交流會(huì)論文集[C];2007年
6 白濤;黃強(qiáng);暢建霞;;基于可行搜索空問優(yōu)化的電力市場(chǎng)下梯級(jí)水電站短期調(diào)峰運(yùn)行研究[A];陜西省水力發(fā)電工程學(xué)會(huì)第三屆青年優(yōu)秀科技論文集[C];2013年
7 覃曉杰;;梯級(jí)水電站的裝機(jī)容量及發(fā)電量關(guān)系曲線分析[A];提高全民科學(xué)素質(zhì)、建設(shè)創(chuàng)新型國(guó)家——2006中國(guó)科協(xié)年會(huì)論文集(下冊(cè))[C];2006年
8 黃春雷;;梯級(jí)水電站水庫(kù)統(tǒng)一調(diào)度技術(shù)分析[A];大型水輪發(fā)電機(jī)組技術(shù)論文集[C];2008年
9 戴建煒;朱江;李澤宏;;烏江梯級(jí)水電站集中運(yùn)行管理及其發(fā)展前景[A];大型水輪發(fā)電機(jī)組技術(shù)論文集[C];2008年
10 戴建煒;朱江;李澤宏;;烏江梯級(jí)水電站集中運(yùn)行管理及其發(fā)展前景[A];2008中國(guó)水力發(fā)電論文集[C];2008年
相關(guān)重要報(bào)紙文章 前8條
1 陳露;肅南寺大隆河梯級(jí)水電站開工[N];張掖日?qǐng)?bào);2007年
2 記者 朱興忠;龍渠梯級(jí)水電站改擴(kuò)建工程竣工[N];張掖日?qǐng)?bào);2010年
3 通訊員 張順東;十六團(tuán)與烏恰縣民營(yíng)企業(yè)合作建設(shè)梯級(jí)水電站[N];兵團(tuán)日?qǐng)?bào)(漢);2011年
4 本報(bào)記者 紀(jì)軍 通訊員 田峰;吐木秀克水電站進(jìn)入裝機(jī)階段[N];阿克蘇日?qǐng)?bào);2009年
5 秦延安;陜西喜河水電站加快建設(shè)步伐[N];中國(guó)水利報(bào);2005年
6 通訊員 謝國(guó)新;國(guó)電集團(tuán)接管湖北鄂坪水電站[N];中國(guó)電力報(bào);2009年
7 王橙澄 王新明;烏江最后一個(gè)梯級(jí)水電站投產(chǎn)[N];西部時(shí)報(bào);2013年
8 記者 姚榮 特約記者 顧鴻亮;打好3個(gè)硬仗 興辦10件實(shí)事[N];蘭州日?qǐng)?bào);2006年
相關(guān)博士學(xué)位論文 前10條
1 石萍;金沙江中游梯級(jí)水電站水庫(kù)優(yōu)化調(diào)度系統(tǒng)的結(jié)構(gòu)識(shí)別與應(yīng)用研究[D];武漢大學(xué);2014年
2 蔣志強(qiáng);嵌套結(jié)構(gòu)并行多維動(dòng)態(tài)規(guī)劃算法及其應(yīng)用研究[D];華北電力大學(xué);2015年
3 李芳芳;大型梯級(jí)水電站調(diào)度運(yùn)行的優(yōu)化算法[D];清華大學(xué);2011年
4 胡國(guó)強(qiáng);梯級(jí)水電站優(yōu)化調(diào)度模型與算法研究[D];華北電力大學(xué)(北京);2007年
5 鐘煒;流域梯級(jí)水電站聯(lián)合優(yōu)化調(diào)度輔助決策系統(tǒng)研究[D];天津大學(xué);2007年
6 許可;面向生態(tài)保護(hù)和恢復(fù)的梯級(jí)水電站聯(lián)合優(yōu)化調(diào)度研究[D];華中科技大學(xué);2011年
7 王學(xué)敏;面向生態(tài)和航運(yùn)的梯級(jí)水電站多目標(biāo)發(fā)電優(yōu)化調(diào)度研究[D];華中科技大學(xué);2015年
8 宋恒力;流域梯級(jí)水電站聯(lián)盟策略的博弈研究[D];華中科技大學(xué);2013年
9 宋洋;蘇帕河流域梯級(jí)水電站聯(lián)合優(yōu)化調(diào)度模型研究[D];天津大學(xué);2005年
10 張景瑞;梯級(jí)水電站和水火電站群優(yōu)化調(diào)度的PSO算法[D];華中科技大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 黃瑜珈;基于多目標(biāo)布谷鳥算法的風(fēng)光水聯(lián)合調(diào)度研究[D];西安理工大學(xué);2017年
2 謝宗m:;電力系統(tǒng)輔助規(guī)劃中梯級(jí)水電站優(yōu)化運(yùn)行研究[D];西南交通大學(xué);2016年
3 吳文惠;烏江梯級(jí)水電站聯(lián)合調(diào)度發(fā)電效益考核評(píng)價(jià)研究[D];中國(guó)水利水電科學(xué)研究院;2016年
4 陳磊;提高梯級(jí)水電站發(fā)電量的優(yōu)化運(yùn)行方案研究及實(shí)現(xiàn)[D];鄭州大學(xué);2015年
5 趙佳情;三峽—葛洲壩梯級(jí)水電站汛期分級(jí)優(yōu)化調(diào)度研究[D];天津大學(xué);2014年
6 范金驥;基于改進(jìn)遺傳算法的梯級(jí)水電站優(yōu)化調(diào)度研究[D];華北電力大學(xué);2016年
7 高力奇;考慮電網(wǎng)典型日需求的水火電長(zhǎng)期協(xié)調(diào)方法研究[D];大連理工大學(xué);2016年
8 馮志鵬;瀾滄江梯級(jí)水電站優(yōu)化調(diào)度方法研究[D];華北水利水電大學(xué);2016年
9 喬祺;清江梯級(jí)水電站負(fù)荷優(yōu)化分配研究與應(yīng)用[D];華中科技大學(xué);2016年
10 吳巍;響應(yīng)電網(wǎng)負(fù)荷需求的清江梯級(jí)水電站日計(jì)劃編制研究[D];華中科技大學(xué);2016年
,本文編號(hào):2183355
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2183355.html