基于貝葉斯網(wǎng)絡(luò)的電網(wǎng)工程質(zhì)量管理風(fēng)險(xiǎn)研究——以川藏電力聯(lián)網(wǎng)工程為例
[Abstract]:This paper studies the risk of power grid project quality management based on the Sichuan-Tibet electric power network project, and puts forward a three-dimensional quality management risk management system, which includes project stakeholder dimension, project life cycle dimension and project quality management process dimension. Based on Bayesian network, the risk assessment model of power network quality management is established. The key quality management risk factors, such as imperfect quality assurance system, insufficient communication among stakeholders and so on, are identified in combination with expert opinions. And respectively engaged in before, the matter, after the three aspects of targeted countermeasures.
【作者單位】: 西南交通大學(xué)經(jīng)濟(jì)管理學(xué)院;
【分類號(hào)】:TM727
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;本世紀(jì)我國(guó)將實(shí)施電力大聯(lián)網(wǎng)工程[J];福建能源開(kāi)發(fā)與節(jié)約;2000年02期
2 ;220kV崇明聯(lián)網(wǎng)工程正式啟動(dòng)[J];上海電力;2008年05期
3 本刊編輯部;;500千伏海南聯(lián)網(wǎng)工程正式投運(yùn)[J];華北電力技術(shù);2009年09期
4 黨亞利;;真誠(chéng)守衛(wèi)——記青藏聯(lián)網(wǎng)工程醫(yī)療和后勤保障工作[J];國(guó)家電網(wǎng);2011年02期
5 ;能源之路[J];國(guó)家電網(wǎng);2011年12期
6 ;我國(guó)21世紀(jì)初將實(shí)施電力聯(lián)網(wǎng)工程[J];能源工程;1999年04期
7 李燕輝;;我國(guó)21世紀(jì)初實(shí)施的聯(lián)網(wǎng)工程[J];水電科技進(jìn)展;1999年01期
8 ;電力行業(yè)媒體青藏聯(lián)網(wǎng)工程聯(lián)合采訪專題 電力天路[J];中國(guó)電力企業(yè)管理;2011年19期
9 ;青藏聯(lián)網(wǎng)工程投入試運(yùn)行[J];山東電力高等?茖W(xué)校學(xué)報(bào);2011年06期
10 倪e,
本文編號(hào):2162318
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2162318.html