鋰電池組充放電管理系統(tǒng)
[Abstract]:In order to reduce the damage of lithium battery and improve the performance of lithium battery, a charge and discharge management system for lithium battery pack is designed, which can manage, monitor and protect the charge and discharge process of lithium battery pack. The charge and discharge management system of lithium battery pack is composed of data acquisition, battery protection, equalization control, communication management and host computer display module, which uses MSP430 single chip microcomputer as control chip to overcharge and overdischarge lithium battery. For the protection of over-current and short-circuit, the single-section lithium battery with different states is managed equably, the working state of lithium battery is monitored, and the layered management of lithium battery pack and single-section lithium cell is completed. This paper introduces the design of this subject from the hardware and software of the charge and discharge management system of lithium battery pack. In the hardware design, the hardware circuit of the charge and discharge management system of lithium battery is divided into several modules, including data acquisition module, battery protection module, balance management module and communication module. The data acquisition module is used to collect the voltage, current and temperature of the lithium battery; the battery protection module ensures the safety of the lithium battery during charging and discharging; The communication module realizes the communication between the control chip and the host computer. The software design includes control module, upper computer display and the estimation of state of charge (SOC) of lithium battery. The control module includes the design of data acquisition, charge and discharge protection and balance management; the upper computer display module designs the battery management display interface; by combining the method of ampere-hour integral and open circuit voltage, SOC compensation is added. The SOC of lithium battery is estimated. The charge and discharge experiments were carried out on the lithium battery pack. The accuracy of over discharge threshold voltage of lithium battery is 鹵10mV, and that of overcharge current is 鹵10mA. the relative error of voltage of single battery in lithium battery pack is controlled within 鹵0.12% by equalization management, and the error of SOC estimation value and actual value is less than 鹵1%. The experimental results show that the charge and discharge management system can detect the voltage, current, temperature and residual charge of the lithium battery pack and single section lithium battery, and effectively manage, monitor and protect the lithium battery pack.
【學(xué)位授予單位】:杭州電子科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TM912
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 鐘勝藍(lán);張榆平;;大容量鋰電池組的高效均衡電路設(shè)計(jì)[J];電子質(zhì)量;2010年10期
2 于文峰;倪華;;水雷用一次鋰電池組的設(shè)計(jì)方法[J];水雷戰(zhàn)與艦船防護(hù);2008年01期
3 陳淵睿;伍堂順;毛建一;;動(dòng)力鋰電池組充放電智能管理系統(tǒng)[J];電源技術(shù);2009年08期
4 余能順;徐欣;;基于單片機(jī)控制的電動(dòng)車鋰電池組設(shè)計(jì)[J];重慶工學(xué)院學(xué)報(bào)(自然科學(xué)版);2009年10期
5 劉小平;郭鋒;劉寧一;;一種實(shí)現(xiàn)動(dòng)力鋰電池組充放電管理的主動(dòng)均衡方案[J];電動(dòng)自行車;2010年10期
6 黃勤;嚴(yán)賀彪;凌睿;;串聯(lián)鋰電池組無損均衡管理方案設(shè)計(jì)與實(shí)現(xiàn)[J];計(jì)算機(jī)工程;2011年12期
7 王天福;劉強(qiáng);李志強(qiáng);;動(dòng)力鋰電池組充放電智能管理系統(tǒng)設(shè)計(jì)與實(shí)現(xiàn)[J];電源技術(shù);2011年09期
8 陳道;吳峗;蔣新華;;鋰電池組維護(hù)系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[J];儀表技術(shù);2012年07期
9 許英杰;孫郅佶;李帆;范賢光;;電動(dòng)自行車鋰電池組保護(hù)電路設(shè)計(jì)[J];現(xiàn)代電子技術(shù);2012年16期
10 付騰;姚志成;彭建軍;;基于模糊數(shù)學(xué)的鋰電池組故障診斷[J];電子設(shè)計(jì)工程;2012年20期
相關(guān)會(huì)議論文 前2條
1 陳立;盧雪梅;方明杰;何耀;劉興濤;;電動(dòng)汽車動(dòng)力鋰電池組電源管理系統(tǒng)研究[A];第13屆中國系統(tǒng)仿真技術(shù)及其應(yīng)用學(xué)術(shù)年會(huì)論文集[C];2011年
2 劉興濤;何耀;陳立;張陳斌;陳宗海;;動(dòng)力鋰電池組均衡方法綜述與分析[A];第13屆中國系統(tǒng)仿真技術(shù)及其應(yīng)用學(xué)術(shù)年會(huì)論文集[C];2011年
相關(guān)重要報(bào)紙文章 前5條
1 記者 姜平;恒瑞新能源首條生產(chǎn)線投產(chǎn)[N];珠海特區(qū)報(bào);2011年
2 江蘇 繆耀東 周菊獲;51.8V/30Ah聚合物鋰電池組在電摩中的應(yīng)用(一)[N];電子報(bào);2012年
3 江蘇 繆耀東 周荻;51.8V/30Ah聚合物鋰電池組在電摩中的應(yīng)用(三)[N];電子報(bào);2012年
4 江蘇 廖輝東;51.8V/30Ah聚合物鋰電池組在電摩中的應(yīng)用(二)[N];電子報(bào);2012年
5 李川;抓住有利時(shí)機(jī) 開發(fā)環(huán)保精品[N];中國信息報(bào);2011年
相關(guān)博士學(xué)位論文 前1條
1 何耀;動(dòng)力鋰電池組狀態(tài)估計(jì)策略及管理系統(tǒng)技術(shù)研究[D];中國科學(xué)技術(shù)大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 溫明洋;鋰電池組監(jiān)控系統(tǒng)的設(shè)計(jì)[D];東北大學(xué);2013年
2 張海寧;基于MC9S12單片機(jī)的電動(dòng)汽車鋰電池組監(jiān)控系統(tǒng)研究[D];哈爾濱工業(yè)大學(xué);2015年
3 陳遠(yuǎn)強(qiáng);動(dòng)力鋰電池組生產(chǎn)線機(jī)械手控制系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[D];電子科技大學(xué);2014年
4 賈星遠(yuǎn);鋰電池組充電器與BMS的研究與設(shè)計(jì)[D];南京郵電大學(xué);2016年
5 楊曉冰;適用于低速電動(dòng)汽車的鋰電池組管理系統(tǒng)研究[D];長安大學(xué);2016年
6 夏承成;航空鋰電池組地面維護(hù)系統(tǒng)設(shè)計(jì)與軟件實(shí)現(xiàn)[D];西南科技大學(xué);2016年
7 陳賀;基于能量總線的鋰電池組均衡管理系統(tǒng)設(shè)計(jì)[D];湖南大學(xué);2016年
8 熊亮;大功率鋰電池組多通道主動(dòng)均衡技術(shù)研究[D];西南科技大學(xué);2016年
9 陳曉彬;太陽能游覽船舶動(dòng)力鋰電池組的故障診斷研究[D];集美大學(xué);2016年
10 劉璐;射流冷卻對(duì)動(dòng)力鋰電池組熱環(huán)境控制的模擬研究[D];中原工學(xué)院;2017年
,本文編號(hào):2131099
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2131099.html