660MW火電機(jī)組智能化電廠實(shí)施方案
本文選題:智能化電站 + 運(yùn)行優(yōu)化管控系統(tǒng) ; 參考:《華北電力大學(xué)(北京)》2017年碩士論文
【摘要】:本文依托華電土右電廠2*660MW超臨界機(jī)組建設(shè)過程,結(jié)合該電廠的基礎(chǔ)設(shè)備情況,充分利用基建期的優(yōu)勢(shì),結(jié)合基建項(xiàng)目在系統(tǒng)設(shè)計(jì)優(yōu)化、設(shè)備選型的高標(biāo)準(zhǔn)、基建質(zhì)量管理手段、生產(chǎn)運(yùn)營(yíng)期間的先進(jìn)管理手段的應(yīng)用這一系列問題進(jìn)行了統(tǒng)籌考慮,規(guī)劃并正在實(shí)施保障基數(shù)據(jù)全面、可視;操作執(zhí)行精準(zhǔn)、有章可循;管控手段豐富完善;領(lǐng)導(dǎo)決策科學(xué)精益的智能化電站的建設(shè)方案。本課題從設(shè)備檢修管控系統(tǒng)、運(yùn)行優(yōu)化管控系統(tǒng)、統(tǒng)和網(wǎng)絡(luò)架構(gòu)與通信三個(gè)方面介紹該電廠智能化電站的具體實(shí)施方案和運(yùn)行成果。其中設(shè)備管理系統(tǒng)包括:可視化金屬監(jiān)督管理系統(tǒng)、精密點(diǎn)檢系統(tǒng)、重要設(shè)備三維建模、大型轉(zhuǎn)動(dòng)機(jī)械在線監(jiān)測(cè)、全優(yōu)潤(rùn)滑油管理系統(tǒng)五個(gè)方面。運(yùn)行管理系統(tǒng)包括:可視化設(shè)備圖模導(dǎo)航系統(tǒng)、三維生產(chǎn)實(shí)時(shí)系統(tǒng)、兩票三制管理系統(tǒng)、運(yùn)行臺(tái)帳和交接班記錄管理系統(tǒng)、設(shè)備定期輪換管理系統(tǒng)。網(wǎng)絡(luò)架構(gòu)和通訊包括:項(xiàng)目整體特點(diǎn)、機(jī)房建設(shè)方案、全廠基礎(chǔ)網(wǎng)絡(luò)組網(wǎng)方案、數(shù)據(jù)中心虛擬化設(shè)計(jì)方案、數(shù)據(jù)備份方案、終端桌面云方案。最后本課題給出實(shí)現(xiàn)智能化電站的資金預(yù)算,給其他電廠在智能化電站新建時(shí)提供參考。本課題的研究背景在于現(xiàn)階段我國(guó)的絕大部分電廠還是沿用數(shù)字化電廠設(shè)計(jì)理念,智能化電廠設(shè)計(jì)實(shí)施還沒有成熟的方案,該電廠的智能化建設(shè)并成功實(shí)施為其他電廠提夠了可靠的借鑒。
[Abstract]:This paper relies on the construction process of 2Q660MW supercritical unit in Huadian Tuyou Power Plant, combined with the basic equipment situation of the power plant, taking full advantage of the advantages of the capital construction period, combining with the system design optimization, the high standard of equipment selection and the means of capital construction quality management. The application of advanced management means during production and operation has been considered as a whole, the planning and implementation of the guarantee base data is comprehensive and visual, the operation is accurate, there are rules to be followed, the means of management and control are abundant and perfect. Leading the decision-making scientific lean intelligent power station construction plan. This paper introduces the concrete implementation scheme and operation results of the intelligent power station in this power plant from three aspects: equipment maintenance and control system, operation optimization control system, system and network structure and communication. The equipment management system includes five aspects: visual metal supervision and management system, precision point inspection system, 3D modeling of important equipment, on-line monitoring of large-scale rotating machinery, and all-excellent lubricating oil management system. The operation management system includes: visual equipment graphics navigation system, three-dimensional production real-time system, two-vote and three-system management system, running account and shift record management system, equipment periodic rotation management system. The network architecture and communication include: the overall characteristics of the project, the computer room construction plan, the whole plant basic network scheme, the data center virtualization design scheme, the data backup scheme, the terminal desktop cloud scheme. At last, the paper gives the budget of realizing intelligent power station, and provides reference for other power plants to build intelligent power station. The research background of this subject lies in the fact that most of the power plants in our country still follow the design concept of digital power plants at the present stage, and there is no mature scheme for intelligent power plant design. The intelligent construction and successful implementation of this power plant can be used as a reliable reference for other power plants.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TM621
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張晗;;電網(wǎng)主設(shè)備狀態(tài)監(jiān)測(cè)參數(shù)體系的構(gòu)建與應(yīng)用[J];陜西電力;2016年10期
2 楊博;;火力發(fā)電廠設(shè)備精密點(diǎn)檢體系及其應(yīng)用[J];石化技術(shù);2016年09期
3 潘睿;陳偉;梅春華;張淵淵;蔡文;;新型檢測(cè)技術(shù)在電力設(shè)備狀態(tài)監(jiān)測(cè)中的應(yīng)用[J];自動(dòng)化應(yīng)用;2015年03期
4 雷鈺;鄢良國(guó);崔亞瓊;張睿;陳麗彬;葛振中;;設(shè)備狀態(tài)監(jiān)測(cè)信息化技術(shù)在自動(dòng)化物流系統(tǒng)的應(yīng)用[J];物流技術(shù)與應(yīng)用;2013年05期
5 危元華;任曉東;李智;董青;馬欣欣;朱環(huán);孔祥正;邵一鳴;趙焱;;數(shù)字化電廠的概念及方案研究[J];電力建設(shè);2013年04期
6 蔣瞻;;設(shè)備狀態(tài)監(jiān)測(cè)與故障診斷技術(shù)在設(shè)備管理中的應(yīng)用[J];木工機(jī)床;2012年02期
7 馬欣欣;;現(xiàn)場(chǎng)總線技術(shù)在大型火電廠的應(yīng)用[J];中國(guó)儀器儀表;2012年02期
8 黃琨;;數(shù)字化電廠的概念、現(xiàn)狀與應(yīng)用展望[J];科技信息;2011年29期
9 陳敏鑫;王新超;韓世亮;李鵬;;電廠全面智能化的研究與應(yīng)用[J];儀器儀表與分析監(jiān)測(cè);2010年04期
10 張程明;;淺論數(shù)字化電廠基本框架[J];沿海企業(yè)與科技;2010年10期
相關(guān)會(huì)議論文 前6條
1 張家治;;葛洲壩電站智能化建設(shè)的研究和實(shí)踐[A];中國(guó)水力發(fā)電工程學(xué)會(huì)信息化專委會(huì)、水電控制設(shè)備專委會(huì)2014年會(huì)暨學(xué)術(shù)交流會(huì)論文集[C];2014年
2 陳世和;;智能電站發(fā)展現(xiàn)狀及展望[A];智能化電站技術(shù)發(fā)展研討暨電站自動(dòng)化2013年會(huì)論文集[C];2013年
3 凌默儂;;智能電網(wǎng)對(duì)電站自動(dòng)化的啟示[A];智能化電站技術(shù)發(fā)展研討暨電站自動(dòng)化2013年會(huì)論文集[C];2013年
4 張晉賓;;淺談數(shù)字化電廠的概念和實(shí)施[A];智能化電站技術(shù)發(fā)展研討暨電站自動(dòng)化2013年會(huì)論文集[C];2013年
5 馬菊蘭;;臨港燃機(jī)“機(jī)組一鍵啟!痹谶M(jìn)程中[A];第八屆長(zhǎng)三角電機(jī)、電力科技分論壇論文集[C];2011年
6 章政海;;數(shù)字化電廠信息系統(tǒng)設(shè)計(jì)研究[A];二○○九年全國(guó)電力企業(yè)信息化大會(huì)論文集[C];2009年
相關(guān)碩士學(xué)位論文 前1條
1 蘇茂均;火電廠電氣綜合自動(dòng)化系統(tǒng)的研究[D];華北電力大學(xué)(河北);2004年
,本文編號(hào):2058891
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2058891.html