火電項目設(shè)計階段工程造價控制研究
本文選題:火電 + 造價控制 ; 參考:《蘭州交通大學(xué)》2017年碩士論文
【摘要】:近年來,隨著社會用電量的不斷增長,火電機組裝機容量逐年增長,火電項目建設(shè)投資保持著較高的增速。由于火電項目建設(shè)周期長、投資大的特點,做好工程造價控制,提高項目經(jīng)濟性已成為火電項目工程管理中的重中之重。作為對項目投資的影響占比60%—70%的設(shè)計階段,造價控制對整個項目的實施具有極大的作用。本研究首先對當(dāng)前的設(shè)計階段造價控制方法展開了分析。發(fā)現(xiàn)限額設(shè)計存在參考指標(biāo)沒有統(tǒng)一標(biāo)準(zhǔn),不同地域、技術(shù)參數(shù)、系統(tǒng)配置無法與限額指標(biāo)匹配的問題,價值工程在功能分析階段較為復(fù)雜,功能評價主觀性較強等問題;诖,對限額設(shè)計方法進行優(yōu)化,并采用AHP來優(yōu)選系統(tǒng)方案,再結(jié)合設(shè)計合同管理與設(shè)計監(jiān)理兩大管理內(nèi)容,構(gòu)建起“四位一體”的控制模型:在設(shè)計開始之初,通過設(shè)計招標(biāo)與設(shè)計競賽相結(jié)合的方式確定設(shè)計單位,利用獎懲機制的設(shè)計費用管理,達到了以設(shè)計合同為依據(jù)的設(shè)計管理目的;隨后,通過《火電工程限額設(shè)計參考造價指標(biāo)》的應(yīng)用,以對不同技術(shù)方案的項目進行模塊調(diào)整后的限額指標(biāo)作為造價控制的依據(jù),對傳統(tǒng)限額設(shè)計方法進行改進,提出了豎向控制與平行控制相結(jié)合的限額設(shè)計管理方式;在系統(tǒng)方案配置的問題上,提出可基于AHP進行方案優(yōu)選方法;最后,通過采用設(shè)計監(jiān)理,對設(shè)計工作進行全過程的跟蹤管理,并引入相應(yīng)激勵機制,激發(fā)監(jiān)理單位對造價控制的積極性,以提高設(shè)計質(zhì)量,控制工程造價。本研究構(gòu)建的“四位一體”控制模型,彌補了在火電項目設(shè)計階段缺乏成型的控制模型的缺點。最后,通過將其應(yīng)用在哈密電廠4×660MW機組新建工程的案例上,論證了此控制模型的有效性和可行性。
[Abstract]:In recent years, with the continuous growth of social electricity consumption, the installed capacity of thermal power units is increasing year by year, and the investment in thermal power project construction has maintained a high growth rate. Due to the long construction period and large investment of thermal power project, it has become the most important task in the project management to control the project cost and improve the project economy. As the design stage of 60%-70% of the project investment, the cost control plays a great role in the implementation of the whole project. In this study, the current design stage of cost control methods are analyzed. It is found that there are some problems in quota design, such as no uniform standard of reference index, different regions, technical parameters, system configuration unable to match quota index, complex value engineering in function analysis stage, strong subjectivity of function evaluation, and so on. Based on this, this paper optimizes the method of quota design, adopts AHP to optimize the system scheme, and combines the two management contents of design contract management and design supervision, and constructs a "four-in-one" control model: at the beginning of design, Through the combination of design bidding and design competition, the design unit is determined, and the design cost management based on the reward and punishment mechanism is used to achieve the purpose of design management based on the design contract. Through the application of reference cost Index for quota Design of Thermal Power Project, the quota index after module adjustment for different technical projects is taken as the basis of cost control, and the traditional quota design method is improved. This paper puts forward the management mode of quota design combining vertical control and parallel control, and puts forward the method of optimal scheme selection based on AHP on the problem of system scheme configuration. Finally, through the adoption of design supervision, In order to improve the design quality and control the project cost, the design work is followed and managed in the whole process, and the corresponding incentive mechanism is introduced to stimulate the enthusiasm of the supervision unit to the cost control. The "four-in-one" control model is constructed in this paper, which makes up for the shortage of the control model in the design phase of thermal power project. Finally, the validity and feasibility of the control model are demonstrated by applying it to the new project of 4 脳 660MW unit in Hami Power Plant.
【學(xué)位授予單位】:蘭州交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TU723.3;TM621
【參考文獻】
相關(guān)期刊論文 前10條
1 劉華;;淺談建設(shè)工程設(shè)計階段的投資控制[J];價值工程;2012年19期
2 鄒智強;;工程設(shè)計階段建設(shè)工程投資控制的探討[J];建筑經(jīng)濟;2011年S1期
3 徐友全;成存朋;;關(guān)于建設(shè)項目設(shè)計階段投資控制的探討[J];建筑經(jīng)濟;2011年S1期
4 謝新喜;姚彩平;;限額設(shè)計在建筑工程設(shè)計階段的應(yīng)用分析[J];當(dāng)代經(jīng)濟;2011年08期
5 周耀俊;;淺談設(shè)計階段的投資控制[J];建筑經(jīng)濟;2009年04期
6 姚傳勤;;從限額設(shè)計談投資控制[J];安徽建筑;2006年03期
7 熊瑛;試論設(shè)計階段對工程造價的合理控制[J];西部探礦工程;2005年03期
8 王尚軍;在設(shè)計階段合理降低工程造價的途徑[J];科學(xué)管理研究;2004年S1期
9 吳仲兵,吳剛;設(shè)計階段投資控制中限額設(shè)計總值分配方法的探討[J];中國勘察設(shè)計;2004年10期
10 肖文瓊;設(shè)計階段的工程造價管理[J];湖南水利水電;2000年05期
相關(guān)碩士學(xué)位論文 前10條
1 劉勇波;基于模糊層次分析法的房地產(chǎn)設(shè)計階段造價價值指數(shù)研究[D];武漢科技大學(xué);2015年
2 陳冠名;高鐵站房設(shè)計階段造價影響因素及相關(guān)性研究[D];華南理工大學(xué);2015年
3 黃琳琳;基于價值工程的商品住宅項目設(shè)計階段造價控制優(yōu)化研究[D];廣西大學(xué);2015年
4 段屹立;工程造價咨詢企業(yè)在設(shè)計階段的造價管理研究[D];河北工業(yè)大學(xué);2015年
5 于今;工程建設(shè)項目設(shè)計階段的造價控制管理研究[D];沈陽大學(xué);2013年
6 萬洪浩;住宅項目投資決策與設(shè)計階段造價管理[D];青島理工大學(xué);2012年
7 曹鑫;青海日月山變電站項目設(shè)計階段控制造價研究[D];西安建筑科技大學(xué);2012年
8 陳少兵;南湖電力項目設(shè)計階段造價控制研究[D];華北電力大學(xué);2011年
9 孔娟;電力工程項目設(shè)計階段的造價控制管理研究[D];華北電力大學(xué)(北京);2009年
10 劉曉丹;基于價值視角的建設(shè)項目設(shè)計階段工程造價控制研究[D];天津理工大學(xué);2009年
,本文編號:2025915
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/2025915.html