超高壓輸電線路直流融冰過程中接地故障定位技術(shù)
發(fā)布時間:2018-04-18 13:36
本文選題:直流融冰裝置 + 融冰線路; 參考:《電力系統(tǒng)自動化》2017年20期
【摘要】:直流融冰技術(shù)是解決超高壓輸電線路覆冰問題的有效方法。由于融冰過程中冰水的掉落易導致輸電線路的單相接地故障,研究了融冰線路的故障定位方法,以保障融冰過程的順利進行及融冰設備的安全運行。首先對直流融冰系統(tǒng)的組成及整流器拓撲結(jié)構(gòu)、控制策略進行了介紹并搭建了融冰系統(tǒng)的詳細仿真模型。針對定電流控制方式下直流融冰線路的單相接地故障,通過對沿線電壓分布的深入分析,提出了基于貝瑞隆模型的直流融冰線路接地故障定位方法。利用PSCAD/EMTDC仿真軟件對融冰線路故障進行了仿真驗證,結(jié)果表明該方法能夠?qū)崿F(xiàn)融冰線路接地故障的快速準確定位。
[Abstract]:DC ice-melting technology is an effective method to solve the icing problem of EHV transmission lines.In order to ensure the smooth progress of ice-melting process and the safe operation of ice-melting equipment, the fault location method of ice-melting line is studied because the drop of ice water easily leads to the single-phase grounding fault of transmission line.Firstly, the composition of DC ice-melting system, the topology of rectifier and the control strategy are introduced, and the detailed simulation model of the ice-melting system is built.In view of the single-phase grounding fault of DC ice-melting line under constant current control mode, a method of grounding fault location for DC ice-melting line based on Berelon model is proposed through the in-depth analysis of voltage distribution along the line.The PSCAD/EMTDC simulation software is used to verify the fault of ice-melting line. The results show that the method can locate the ground fault of ice-melting line quickly and accurately.
【作者單位】: 智能電網(wǎng)教育部重點實驗室(天津大學);天津大學電氣自動化與信息工程學院;
【基金】:國家自然科學基金資助項目(51677125) 高等學校博士學科點專項科研基金新教師類資助項目(20120032120085)~~
【分類號】:TM752
【相似文獻】
相關(guān)期刊論文 前10條
1 鄧健;肖順良;姚璞;郭正輝;吳小勇;賀偉明;;220kV線路融冰方案的改進[J];電網(wǎng)技術(shù);2008年04期
2 葉青;李峰;;線路融冰方案的編制及相關(guān)問題分析[J];江西電力;2008年S1期
3 陳興宇;李孝杰;蘇盛;;改進短路融冰方案及效能評估[J];華中電力;2010年06期
4 陳玉珊;;各種短路手段在融冰工作中的應用[J];華中電力;2008年04期
5 劉佐華;;架空輸電線路的融冰方案[J];大眾用電;2009年02期
6 文,
本文編號:1768592
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/1768592.html
最近更新
教材專著