天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 科技論文 > 電氣論文 >

現(xiàn)場總線技術(shù)在數(shù)字化電廠控制系統(tǒng)設(shè)計(jì)中的應(yīng)用研究

發(fā)布時間:2018-04-12 19:10

  本文選題:現(xiàn)場總線 + 數(shù)字化電廠 ; 參考:《華北電力大學(xué)(北京)》2017年碩士論文


【摘要】:近年來隨著國民經(jīng)濟(jì)的快速增長,電力的需求量不斷增加,火電廠控制系統(tǒng)實(shí)現(xiàn)全面數(shù)字化的要求也日益增高,目前電廠的現(xiàn)場控制設(shè)備絕大部分尚未實(shí)現(xiàn)數(shù)字化,傳統(tǒng)的DCS(Distributed Control System)由于其單向性特點(diǎn),不能滿足數(shù)字化電廠的要求,而現(xiàn)場總線技術(shù)的推廣應(yīng)用能夠很好地解決這一問題。本文首先論述了現(xiàn)場總線技術(shù)的特點(diǎn)、系統(tǒng)結(jié)構(gòu)和國內(nèi)外的應(yīng)用情況及發(fā)展現(xiàn)狀,通過對比分析幾種常見的現(xiàn)場總線標(biāo)準(zhǔn)的技術(shù)特點(diǎn)、通信方式及應(yīng)用場合等;其次,分析電廠傳統(tǒng)的控制系統(tǒng)的作用、數(shù)字化電廠控制系統(tǒng)的要求,并對其在現(xiàn)場設(shè)備層采用現(xiàn)場總線系統(tǒng)的配置方案、設(shè)計(jì)原則、注意事項(xiàng)等逐一進(jìn)行了分析;再次,以江蘇沙洲電廠二期2×1000MW機(jī)組擴(kuò)建工程為例,選擇PROFIBUS-DP和FF總線(Foundation Fieldbus)以及HART總線(Highway Addressable Remote Transducer),設(shè)計(jì)其單元機(jī)組和輔助生產(chǎn)控制系統(tǒng)的兩個方面的現(xiàn)場總線方案,并在工程造價方面,與DCS進(jìn)行了投資對比分析,結(jié)果表明,采用現(xiàn)場總線技術(shù)后,不僅在設(shè)備的初次投資方面節(jié)省了資金,而且在設(shè)備安裝、調(diào)試、運(yùn)行維護(hù)方面也節(jié)約了時間和資金,同時,現(xiàn)場總線技術(shù)的應(yīng)用還有利于電廠的全面實(shí)現(xiàn)設(shè)備監(jiān)控和管理的數(shù)字化;之后,應(yīng)用現(xiàn)場總線控制系統(tǒng)診斷軟件從報警事件、在線診斷和歷史記錄三個方面進(jìn)行設(shè)備管理與診斷,并同常規(guī)的DCS控制系統(tǒng)進(jìn)行對比。最后,圍繞電廠信息系統(tǒng)展開,實(shí)現(xiàn)電廠全過程的信息數(shù)字化、網(wǎng)絡(luò)化、集成化,為企業(yè)及時提供準(zhǔn)確有效的信息服務(wù)。
[Abstract]:In recent years, with the rapid growth of national economy, the demand for electric power is increasing, and the requirement of full digitization of thermal power plant control system is increasing day by day. At present, most of the field control equipment in power plant has not been digitized.Traditional DCS(Distributed Control system can not meet the requirement of digital power plant because of its unidirectional characteristics, but the popularization and application of fieldbus technology can solve this problem well.This paper first discusses the characteristics of fieldbus technology, system structure, application situation and development status at home and abroad, through comparative analysis of several common fieldbus standards technical characteristics, communication methods and applications, etc.This paper analyzes the function of traditional control system in power plant, the requirements of digital power plant control system, and analyzes the configuration scheme, design principle and matters needing attention of the field bus system in the field equipment layer one by one.Taking the 2 脳 1000MW unit expansion project of Jiangsu Shazhou Power Plant as an example, the field bus schemes of PROFIBUS-DP and FF bus Foundation Fieldbus and HART bus Highway Addressable Remote Transducer are selected to design the two aspects of unit unit and auxiliary production control system, and the project cost.Compared with DCS, the results show that the field bus technology not only saves money in the initial investment of equipment, but also saves time and money in installation, debugging, operation and maintenance of equipment.The application of fieldbus technology is also conducive to the overall realization of the digitization of equipment monitoring and management in power plants. After that, the diagnosis software of fieldbus control system is used from alarm events.Equipment management and diagnosis are carried out in three aspects: online diagnosis and history record, and compared with conventional DCS control system.Finally, focusing on the power plant information system to realize the whole process of power plant information digitization, networking, integration, for enterprises to provide timely accurate and effective information services.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TM621.6

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 董以旺;;現(xiàn)場總線在熱電廠控制系統(tǒng)的應(yīng)用[J];黑龍江科技信息;2016年06期

2 官翔;卓勇;;數(shù)字化電廠現(xiàn)場總線技術(shù)的應(yīng)用[J];低碳世界;2014年07期

3 張學(xué)孟;劉智銘;;數(shù)字化電廠建設(shè)的關(guān)鍵技術(shù)及發(fā)展[J];廣東電力;2012年09期

4 楊浚;姜春敏;;現(xiàn)場總線技術(shù)在數(shù)字化電廠中的應(yīng)用[J];山東電力技術(shù);2012年05期

5 柳倩;裴玉良;任志平;劉桂生;;EDPF-NT分散控制系統(tǒng)在某1000MW機(jī)組中的應(yīng)用[J];江蘇電機(jī)工程;2012年03期

6 畢建惠;王芙蓉;;現(xiàn)場總線技術(shù)在火電廠機(jī)組控制中的應(yīng)用分析[J];中國電力;2009年04期

7 李大中;劉義學(xué);;現(xiàn)場總線技術(shù)在大型火電機(jī)組主輔控系統(tǒng)中的應(yīng)用探討[J];華北電力技術(shù);2009年03期

8 劉宇穗;張振全;李軍;周明;;數(shù)字化電廠架構(gòu)及現(xiàn)場總線控制系統(tǒng)設(shè)計(jì)[J];熱力發(fā)電;2008年12期

9 楊育紅;劉金魁;;淺談現(xiàn)場總線在電廠中的應(yīng)用[J];山東電力技術(shù);2008年02期

10 顏渝坪;崔逸群;王春利;曾衛(wèi)東;丁偉;董芳;周斌;傅望安;;火電廠現(xiàn)場總線控制系統(tǒng)的成功應(yīng)用[J];中國電力;2007年03期

相關(guān)博士學(xué)位論文 前1條

1 吳震東;無線傳感器網(wǎng)絡(luò)多節(jié)點(diǎn)協(xié)同相關(guān)問題研究[D];浙江大學(xué);2007年

相關(guān)碩士學(xué)位論文 前3條

1 張翼;現(xiàn)場總線技術(shù)在數(shù)字化發(fā)電廠中的應(yīng)用研究[D];上海交通大學(xué);2009年

2 付婕;基于CC-LINK/LT低壓供配電監(jiān)控系統(tǒng)研究與設(shè)計(jì)[D];電子科技大學(xué);2008年

3 關(guān)朝旺;工業(yè)設(shè)備網(wǎng)通信接口技術(shù)在電力監(jiān)控系統(tǒng)中的應(yīng)用研究[D];重慶大學(xué);2004年

,

本文編號:1741043

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/1741043.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶a784b***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com