華能營(yíng)口電廠脫硫系統(tǒng)增容改造項(xiàng)目進(jìn)度管理研究
本文關(guān)鍵詞:華能營(yíng)口電廠脫硫系統(tǒng)增容改造項(xiàng)目進(jìn)度管理研究 出處:《吉林大學(xué)》2017年碩士論文 論文類型:學(xué)位論文
更多相關(guān)文章: 關(guān)鍵線路 進(jìn)度控制 安全管理 項(xiàng)目管理
【摘要】:華能營(yíng)口電廠脫硫系統(tǒng)已經(jīng)不能適應(yīng)現(xiàn)代社會(huì)經(jīng)濟(jì)發(fā)展的需要,必然進(jìn)行脫硫增容改造,以保證脫硫效率的提升和排放濃度的下降,還符合國(guó)家和地方環(huán)保政策的約束。有必要對(duì)華能營(yíng)口電廠脫硫系統(tǒng)增容改造項(xiàng)目進(jìn)行深入分析,結(jié)合火電廠脫硫系統(tǒng)增容改造項(xiàng)目工程建設(shè)的特點(diǎn),討論和分析如何能夠合理的控制工期,如何合理的控制進(jìn)度,在保質(zhì)保量、安全可行、而且在不增加建設(shè)成本的前提下盡可能減少工期。首先,研究明確了華能營(yíng)口脫硫系統(tǒng)增容改造的必要性。即保證脫硫效率的提升和排放濃度的下降,以及符合國(guó)家和地方環(huán)保政策的約束。華能營(yíng)口電廠有必要進(jìn)行超低排放改造,達(dá)到大氣污染物“超低排放”限值,二氧化硫、煙塵和氮氧化合物的排放要符合一定的標(biāo)準(zhǔn)。其次,華能營(yíng)口脫硫系統(tǒng)增容改造項(xiàng)目進(jìn)度管理存在的問(wèn)題及成因進(jìn)行深入分析。通過(guò)對(duì)項(xiàng)目整體分析,得出前期準(zhǔn)備不充分,設(shè)計(jì)不周全,圖紙拖期的問(wèn)題,以及內(nèi)部協(xié)調(diào)機(jī)制不健全,溝通難以順暢表達(dá)。此外,對(duì)安全管理不到位和勞動(dòng)力不足問(wèn)題也進(jìn)行了詳細(xì)闡述。對(duì)準(zhǔn)備不充分、溝通不順暢、安全不到位和勞動(dòng)力不足四個(gè)問(wèn)題的原因進(jìn)行總結(jié),對(duì)制約項(xiàng)目順利進(jìn)行的影響因素進(jìn)行梳理。再次,研究華能營(yíng)口脫硫系統(tǒng)增容改造項(xiàng)目進(jìn)度的優(yōu)化和控制方案。在進(jìn)度計(jì)劃的調(diào)整優(yōu)化方面,提出進(jìn)度控制優(yōu)化方法、前期進(jìn)度計(jì)劃、施工進(jìn)度計(jì)劃和驗(yàn)收進(jìn)度計(jì)劃四個(gè)方面分別說(shuō)明,采用計(jì)劃分解結(jié)構(gòu)圖、甘特圖、網(wǎng)絡(luò)圖和關(guān)鍵路徑圖四種方式對(duì)優(yōu)化方法進(jìn)行說(shuō)明。在項(xiàng)目控制方法上總結(jié)了事前控制、事中控制和事后控制的關(guān)系,研究采用事前控制和事中控制相結(jié)合的方式,事后控制進(jìn)行補(bǔ)充,充分說(shuō)明了項(xiàng)目改造的進(jìn)度控制方法。最后,提出華能營(yíng)口脫硫系統(tǒng)增容改造項(xiàng)目進(jìn)度的保障措施。研究從解決資源浪費(fèi)的保障、制度管理的保障和安全保障三個(gè)方面充分說(shuō)明項(xiàng)目保障管理的重要性。在資源浪費(fèi)方面,提出資源配置、降低成本和消除設(shè)計(jì)缺陷三個(gè)方面具體的保障措施。在制度保障方面,提出組織措施、技術(shù)保障、信息保障、進(jìn)度保障四個(gè)方面的保障措施。在安全保障方面,提出安全管制措施、雨季施工措施、防雨防電保障、防火防爆安全保障四個(gè)方面。本文以項(xiàng)目管理理論為基礎(chǔ),結(jié)合火電廠脫硫系統(tǒng)增容改造項(xiàng)目工程建設(shè)的特點(diǎn),討論和分析如何能夠合理的控制工期,因超低排放改造項(xiàng)目具有投資大、工程量大和工期長(zhǎng)等特點(diǎn),這對(duì)于主體工程為脫硫系統(tǒng)增容改造項(xiàng)目的電廠來(lái)說(shuō)都是一項(xiàng)較大的投資。如何合理的控制進(jìn)度,在保質(zhì)保量、安全可行、而且在不增加建設(shè)成本的前提下盡可能減少工期就成為當(dāng)下大多數(shù)電廠努力研究的問(wèn)題。這項(xiàng)研究成果不僅僅可以應(yīng)用于營(yíng)口電廠脫硫系統(tǒng)增容改造項(xiàng)目,還可以在其他電廠以及其他大型更改項(xiàng)目中進(jìn)行推廣。
[Abstract]:The desulfurization system of Huaneng Yingkou Power Plant can not meet the needs of modern social and economic development, so it is necessary to carry out desulphurization and capacity enhancement to ensure the improvement of desulphurization efficiency and the decrease of emission concentration. It is also in line with the constraints of national and local environmental protection policies. It is necessary to carry out in-depth analysis of the capacity increase and transformation project of Huaneng Yingkou Power Plant desulfurization system, combining with the characteristics of the project construction of the capacity increase and transformation project of the desulfurization system of thermal power plant. Discuss and analyze how to control the construction period reasonably, how to control the schedule reasonably, which can reduce the construction period as far as possible without increasing the cost of construction. First of all, it is safe and feasible to ensure the quality and quantity of the project. The necessity of capacity increase and transformation of Huaneng Yingkou desulfurization system is studied, that is, to ensure the improvement of desulphurization efficiency and the decrease of emission concentration. And in line with national and local environmental protection policy constraints. Huaneng Yingkou power plant is necessary to carry out ultra-low emissions transformation, to achieve the atmospheric pollutants "ultra-low emissions" limit, sulfur dioxide. Emissions of soot and nitrogen oxides should meet certain standards. Secondly, the problems and causes of schedule management of Huaneng Yingkou desulphurization system capacity increase project are analyzed. Through the overall analysis of the project. Draw early preparation is not enough, design is not perfect, drawing delays, as well as internal coordination mechanism is not perfect, communication is difficult to express smoothly. The problems of inadequate safety management and labor shortage are also discussed in detail. The reasons for the four problems are summarized, such as inadequate preparation, poor communication, inadequate security and insufficient labor force. Thirdly, research on the Huaneng Yingkou desulphurization system capacity increase project schedule optimization and control program. In terms of schedule adjustment and optimization. Proposed the schedule control optimization method, the Prophase schedule plan, the construction schedule plan and the acceptance schedule plan four aspects respectively explains, uses the plan to decompose the structure chart, the Gantt chart. Network diagram and critical path diagram are four ways to explain the optimization method. In the project control method, the relationship among the prior control, the control in the event and the control after the event is summarized. The research adopts the combination of pre-control and in-the-event control, and then complements it with after-control, which fully explains the progress control method of the project transformation. Finally. This paper puts forward the measures to guarantee the progress of the capacity increase and renovation project of Huaneng Yingkou desulphurization system, and studies the guarantee of solving the waste of resources. The guarantee and security of system management fully explain the importance of project security management. In the aspect of waste of resources, resource allocation is put forward. In the aspect of system guarantee, the paper puts forward four safeguard measures: organization measure, technical guarantee, information guarantee, schedule guarantee. In the aspect of security, the author puts forward the following three aspects: reducing cost and eliminating design defects, and puts forward four kinds of safeguard measures: organization measure, technology guarantee, information guarantee and progress guarantee. Safety control measures, construction measures in rainy season, rain and electricity protection, fire and explosion protection are put forward. This paper is based on project management theory. Combined with the characteristics of the project construction of the desulfurization system of thermal power plant, this paper discusses and analyzes how to control the construction period reasonably, because the super-low emission reconstruction project has the characteristics of large investment, large amount of construction and long construction period, and so on. This is a large investment for the power plant of the main project for the capacity increase of desulphurization system. How to control the progress reasonably, in quality and quantity, safety and feasibility. And without increasing the construction cost, reducing the construction period as much as possible has become the problem of most power plants. This research result can not only be used in Yingkou power plant desulphurization system capacity increase transformation project. It can also be popularized in other power plants and other large-scale change projects.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:X773
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 趙安平;淺談煤炭燃前脫硫技術(shù)現(xiàn)狀及展望[J];煤;2004年01期
2 景國(guó)東;淺談煤炭脫硫技術(shù)[J];煤礦現(xiàn)代化;2004年01期
3 喻舒;煤炭燃前脫硫技術(shù)[J];電站系統(tǒng)工程;2005年05期
4 廖繼勇;畢學(xué)工;熊瑋;周少豐;姜廣森;;關(guān)于燒結(jié)廢氣脫硫技術(shù)發(fā)展現(xiàn)狀的分析[J];南方金屬;2006年01期
5 邱亞林;楊麗;許守東;俞炳豐;;煤的微生物浸出脫硫技術(shù)[J];陜西煤炭;2006年01期
6 周桂銓;;煤炭脫硫技術(shù)和環(huán)境保護(hù)[J];礦業(yè)快報(bào);2006年07期
7 張澤;王欽;;脫硫企業(yè)自強(qiáng)是贏得市場(chǎng)的最高法則[J];環(huán)境;2006年11期
8 孟凡才;;高效物理洗選脫硫新技術(shù)[J];化工之友;2007年17期
9 常西亮;樊彩梅;;煤燃前脫硫新技術(shù)[J];山西化工;2007年05期
10 郝振佳;曹新鑫;焦紅光;;微波技術(shù)在煤脫硫領(lǐng)域中的應(yīng)用及發(fā)展[J];上;;2009年11期
相關(guān)會(huì)議論文 前10條
1 肖友國(guó);劉靜;;脫硫中的硫資源回收[A];第十一屆全國(guó)電除塵學(xué)術(shù)會(huì)議論文集[C];2005年
2 曾鳴;尚德興;徐志強(qiáng);張榮曾;;煤泥燃燒復(fù)合脫硫技術(shù)的研究[A];中國(guó)環(huán)境科學(xué)學(xué)會(huì)2009年學(xué)術(shù)年會(huì)論文集(第二卷)[C];2009年
3 羅春;彭民浩;彭輝;李萍;桂賢豐;;關(guān)于燃煤鍋爐化學(xué)脫硫技術(shù)的初步研究[A];第十屆中國(guó)科協(xié)年會(huì)論文集(二)[C];2008年
4 張永照;;燃煤鍋爐脫硫技術(shù)綜述[A];2004'中國(guó)西安鍋爐節(jié)能環(huán)保技術(shù)交流研討會(huì)論文集[C];2004年
5 楊潤(rùn)全;王懷法;;煤中黃鐵礦賦存狀態(tài)與分選脫硫技術(shù)[A];2005年全國(guó)選煤學(xué)術(shù)會(huì)議論文集[C];2005年
6 王薇;;火電廠利用循環(huán)流化床原理的兩種脫硫技術(shù)[A];“建設(shè)資源節(jié)約型、環(huán)境友好型社會(huì)——節(jié)能、環(huán)保、可持續(xù)發(fā)展”研討會(huì)論文集[C];2006年
7 李達(dá)志;張亞通;;離子液循環(huán)吸收法脫硫技術(shù)[A];燒結(jié)工序節(jié)能減排技術(shù)研討會(huì)文集[C];2009年
8 趙偉;;新型脫硫技術(shù)在礦區(qū)環(huán)境保護(hù)中的應(yīng)用[A];第七次煤炭科學(xué)技術(shù)大會(huì)文集(下冊(cè))[C];2011年
9 袁運(yùn)法;鄭建國(guó);劉永川;;電石渣脫硫的方法[A];第二屆脫硫技術(shù)及脫硫石膏、脫硫灰(渣)處理與利用大會(huì)論文集[C];2008年
10 劉建秋;;燒結(jié)廠脫硫方法的分析與選擇[A];2010年全國(guó)冶金安全環(huán)保學(xué)術(shù)交流會(huì)論文集[C];2010年
相關(guān)重要報(bào)紙文章 前10條
1 陳繼軍;看廠下菜碟:陜西化企脫硫之路[N];中國(guó)化工報(bào);2007年
2 本報(bào)記者 李層;惡性競(jìng)爭(zhēng)嚴(yán)重 脫硫產(chǎn)業(yè)路在何方[N];中國(guó)電力報(bào);2007年
3 陳立勛;梅山脫硫技改工程投入生產(chǎn)[N];中國(guó)冶金報(bào);2003年
4 記者 徐紅;濕式鎂法脫硫工藝省錢又生錢[N];中國(guó)化工報(bào);2013年
5 史躍展;豎爐脫硫“渣”吃香[N];中國(guó)冶金報(bào);2014年
6 本報(bào)記者 高翔 賈曉靜;脫硫攻堅(jiān) 除塵升級(jí)[N];中國(guó)冶金報(bào);2011年
7 本報(bào)記者 馮永鋒;電廠脫硫: 莫把機(jī)遇當(dāng)包袱[N];光明日?qǐng)?bào);2006年
8 本報(bào)特約撰稿人 王維興;鋼廠燒結(jié)脫硫技術(shù)如何選擇?[N];中國(guó)冶金報(bào);2014年
9 趙建國(guó);自主研發(fā)脫硫技術(shù)產(chǎn)業(yè)化前景廣闊[N];中國(guó)知識(shí)產(chǎn)權(quán)報(bào);2008年
10 張振國(guó) 包向軍 趙鵬 何亞斌;我國(guó)焦?fàn)t煤氣脫硫技術(shù)現(xiàn)狀[N];世界金屬導(dǎo)報(bào);2010年
相關(guān)博士學(xué)位論文 前10條
1 舒陳華;基于硼氫化鈉還原的燃料脫硫新方法研究[D];上海交通大學(xué);2014年
2 郭智慧;電解法再生離子液體氧化脫硫工藝的應(yīng)用基礎(chǔ)研究[D];北京化工大學(xué);2014年
3 王捷;超臨界Ir-Ta催化氧化降解焦化脫硫廢液的研究[D];武漢科技大學(xué);2016年
4 呂曉龍;單螺桿擠出脫硫制備再生膠及其結(jié)構(gòu)與性能[D];華南理工大學(xué);2016年
5 李元虎;廢膠粉的生物法與化學(xué)法脫硫再生技術(shù)、機(jī)理及結(jié)構(gòu)與性能研究[D];北京化工大學(xué);2012年
6 李登新;煤的電化學(xué)脫硫基礎(chǔ)研究[D];華東理工大學(xué);2000年
7 王麗英;鞍鋼鐵水預(yù)處理脫硫扒渣全組分利用研究[D];東北大學(xué);2011年
8 徐暉;煙氣鈉堿脫硫吸收富液超聲波解吸方法研究[D];天津大學(xué);2010年
9 鐵占續(xù);微粉煤燃前干法永磁高梯度磁選脫硫基礎(chǔ)研究[D];中國(guó)礦業(yè)大學(xué);2009年
10 趙改菊;含堿工業(yè)廢棄物硫化反應(yīng)特性與機(jī)理實(shí)驗(yàn)研究[D];山東大學(xué);2007年
相關(guān)碩士學(xué)位論文 前10條
1 陳晨;鎂法脫硫廢液中油類物質(zhì)去除實(shí)驗(yàn)研究[D];大連海事大學(xué);2015年
2 趙東梅;煉焦煤介電特性及微波脫硫研究[D];中國(guó)礦業(yè)大學(xué);2015年
3 曾維晨;煉焦煤微波與超聲波聯(lián)合脫硫研究[D];中國(guó)礦業(yè)大學(xué);2015年
4 夏支仙;微波煤脫硫的關(guān)鍵技術(shù)研究[D];電子科技大學(xué);2014年
5 李超;微生物菌脫硫廢胎面膠粉工藝技術(shù)與效果評(píng)估[D];北京化工大學(xué);2015年
6 姚子茂;KR脫硫工藝中攪拌器結(jié)構(gòu)優(yōu)化設(shè)計(jì)[D];江西理工大學(xué);2015年
7 祁曉輝;CNG母站脫硫脫水設(shè)備工藝優(yōu)化研究[D];東北石油大學(xué);2015年
8 程少偉;300MW燃煤矸石循環(huán)流化床鍋爐輔助脫硫技術(shù)研究[D];華北電力大學(xué);2015年
9 謝禮健;HPF法脫硫廢液中二種鹽的收率及純度影響因素的研究[D];遼寧科技大學(xué);2015年
10 林燕;Merrifield resin負(fù)載化咪唑離子液體的合成及其脫硫性質(zhì)研究[D];中國(guó)石油大學(xué)(華東);2014年
,本文編號(hào):1421350
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/1421350.html