【摘要】:近年來(lái),我國(guó)加快推進(jìn)特高壓直流輸電工程的建設(shè),逐步實(shí)現(xiàn)能源資源的優(yōu)化配置,有效緩解經(jīng)濟(jì)發(fā)展與能源需求之間的矛盾。特高壓直流輸電節(jié)約大量的輸電走廊資源,未來(lái)將承擔(dān)我國(guó)西部地區(qū)以及境外電力輸送的重要職能,同時(shí)也是建設(shè)堅(jiān)強(qiáng)智能電網(wǎng)的重要組成部分。目前世界上運(yùn)行的直流輸電工程中,±800kV特高壓直流輸電工程是電壓等級(jí)最高的直流輸電工程。因此,對(duì)于特高壓直流輸電工程過(guò)電壓和絕緣配合提出了更高的要求,進(jìn)行深入細(xì)致的絕緣配合研究,用最合理的成本將各類工況下的過(guò)電壓限制在一個(gè)合理的水平范圍內(nèi)。在保證設(shè)備足夠安全的基礎(chǔ)上盡可能簡(jiǎn)化避雷器配置方案,以達(dá)到經(jīng)濟(jì)合理和安全運(yùn)行的目的。首先,對(duì)各類電磁暫態(tài)仿真軟件進(jìn)行認(rèn)真比較,選取PSCAD/EMTDC作為仿真研究工具。根據(jù)云廣±800kV特高壓直流輸電工程運(yùn)行參數(shù),參考了CIGRE高壓直流輸電(HVDC)標(biāo)準(zhǔn)模型控制策略,完成了特高壓直流輸電系統(tǒng)的模型搭建。針對(duì)平波電抗器的分置與不分置兩種布置方式下,依次對(duì)測(cè)點(diǎn)52、91、92和72四點(diǎn)處電壓進(jìn)行了仿真比較,并計(jì)算了最大持續(xù)運(yùn)行電壓。本文分別對(duì)交流側(cè)接地故障、換流站接地故障和直流線路接地故障進(jìn)行了實(shí)驗(yàn)仿真,計(jì)算了故障時(shí)換流站內(nèi)各點(diǎn)的電壓水平,并且將整流側(cè)和逆變側(cè)接地故障過(guò)電壓特性進(jìn)行了對(duì)比研究。研究結(jié)果表明,整流側(cè)交流母線單相接地故障時(shí),在直流線路出口處將會(huì)出現(xiàn)過(guò)電壓,整體表現(xiàn)為整流側(cè)高于逆變側(cè),逆變側(cè)母線接地故障基本不會(huì)出現(xiàn)過(guò)電壓現(xiàn)象。換流站內(nèi)部直流閥頂接地故障時(shí),布置在極線處和中性母線處的平波電抗器兩端會(huì)出現(xiàn)水平很高的過(guò)電壓,整體來(lái)看整流側(cè)的過(guò)電壓水平要稍高于逆變側(cè);換流變閥側(cè)單相接地故障在整流側(cè)和逆變側(cè)均表現(xiàn)為52處故障最為嚴(yán)重;直流閥頂對(duì)中性母線短路時(shí),除了直流極線上有較高的過(guò)電壓水平外,其余各點(diǎn)電壓水平均不高。直流線路接地故障均表現(xiàn)為非故障極出現(xiàn)過(guò)電壓?jiǎn)栴},尤其在線路中點(diǎn)處發(fā)生接地故障時(shí)非故障極將會(huì)出現(xiàn)水平非常高的過(guò)電壓,流過(guò)故障點(diǎn)的電流水平也非常高。
[Abstract]:In recent years, our country to accelerate the construction of UHV DC transmission project, and gradually realize the optimal allocation of energy resources, effectively alleviate the contradiction between economic development and energy demand. The UHVDC transmission corridor to save large amount of resources, future will play an important role in China's western region and overseas power transmission, an important part of at the same time the construction of strong smart grid. The DC transmission project running on the world at present in the 800kV UHVDC transmission project is the highest voltage level of the DC transmission project. Therefore, for UHV DC transmission project overvoltage and insulation coordination put forward higher requirements, in-depth and meticulous research for insulation coordination. The most reasonable cost over voltage under various working conditions is limited to a reasonable level range. To ensure adequate infrastructure security as much as possible simplified lightning Device configuration, in order to achieve reasonable economic and safe operation. First of all, the electromagnetic transient simulation software to study, PSCAD/EMTDC is chosen as the simulation tool. According to the operating parameters of Yunnan Guangdong 800kV UHVDC transmission project, with reference to the CIGRE high voltage direct current transmission (HVDC) standard model control strategy, completed the HVDC transmission system is built. The flat wave reactor split and not split two kinds of arrangement, in order to point 52,91,92 and 72 four point voltage of the simulation, the maximum continuous operating voltage is calculated. Based on the AC side grounding fault, ground fault and DC converter station line ground fault simulation experiment is carried out, when the fault point in the converter voltage level is calculated, and the rectifier side and the inverter side overvoltage fault characteristics were studied. Comparative study The results show that the rectifier AC bus single-phase grounding fault, the over voltage in the DC line at the outlet will, for the overall performance of the rectifier side is higher than that of the inverter, the inverter side bus grounding fault basically does not appear the phenomenon of over voltage. The internal DC converter valve is connected to ground fault, arranged in the polar and neutral bus. The flat wave reactor ends will appear over voltage level is very high, the overvoltage level overall slightly higher than the rectifier inverter side; converter transformer single-phase grounding fault in the rectifier side and the inverter side were 52 of the most serious fault; DC valve top to the neutral busbar short circuit, in addition to DC polar line over voltage level higher, the voltage level is not high. The DC line grounding fault showed non fault pole over-voltage problems, especially in the line at the midpoint of the ground fault occurs when the non fault pole There will be a very high level of overvoltage, and the current level passing through the fault point is also very high.

【學(xué)位授予單位】:廣西大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2016
【分類號(hào)】:TM721.1

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 薄新全,李壯和;35kV線路接地故障的處理方法[J];煤礦機(jī)電;2001年05期

2 申元林;;接地故障火災(zāi)原因及防范[J];江蘇電器;2006年05期

3 韓中華;;接地故障引發(fā)火災(zāi)的原因探析及預(yù)防[J];煤礦機(jī)電;2009年06期

4 崔吉方;梅成林;徐玉鳳;;與平衡橋有關(guān)的幾種典型接地故障的處理與分析[J];廣東電力;2010年08期

5 李麗;;斷路、短路、接地故障的檢修[J];電工文摘;2010年06期

6 李鵬蛟,劉鳳祥;直流接地故障的查找[J];黑龍江石油化工;2000年02期

7 常瑞增;剩余電流動(dòng)作保護(hù)器防接地故障火災(zāi)和防間接電擊的探討[J];低壓電器;2001年01期

8 王厚余;;電弧性接地故障火災(zāi)的防范[J];電氣工程應(yīng)用;2001年04期

9 牛涌;;接地故障引起火災(zāi)的原因及其預(yù)防[J];黑龍江科技信息;2002年06期

10 ;接地故障保護(hù)器[J];實(shí)用影音技術(shù);2004年05期

相關(guān)會(huì)議論文 前10條

1 王喜慶;;低壓系統(tǒng)中接地故障引發(fā)火災(zāi)原因及防范措施[A];2006北京鐵路局技師論文集[C];2006年

2 程永紅;盧海申;宋效新;李宇奇;陳慶國(guó);高萬(wàn)民;王虹瑾;郭杰;;安陽(yáng)發(fā)電廠300MW汽輪發(fā)電機(jī)定子接地故障的分析與處理[A];全國(guó)火電大機(jī)組(300MW級(jí))競(jìng)賽第36屆年會(huì)論文集(下冊(cè))[C];2007年

3 寧華;仇新利;;一起6kV虛幻接地故障的處理[A];全國(guó)電網(wǎng)中性點(diǎn)接地方式與接地技術(shù)研討會(huì)論文集[C];2005年

4 王永杰;陳啟衛(wèi);陳淑媛;楊岑磊;;接地故障監(jiān)測(cè)儀在FPSO變頻電源接地保護(hù)中的應(yīng)用[A];2009年度海洋工程學(xué)術(shù)會(huì)議論文集(下冊(cè))[C];2009年

5 程穎;;一起接地故障造成停運(yùn)線路保護(hù)動(dòng)作的原因分析[A];2008年云南電力技術(shù)論壇論文集[C];2008年

6 吳振升;楊學(xué)昌;;頻率相關(guān)模型下的配電網(wǎng)接地故障定位仿真[A];’02全國(guó)電工測(cè)試技術(shù)學(xué)術(shù)交流會(huì)論文集[C];2002年

7 陳剛;王鴻雁;;直流系統(tǒng)接地故障監(jiān)測(cè)方法比較[A];第十屆全國(guó)煤礦自動(dòng)化學(xué)術(shù)年會(huì)論文集[C];2000年

8 王敬華;薛永端;徐丙垠;康小寧;;鐵路電力自閉/貫通線路接地故障分段技術(shù)的研究[A];2006中國(guó)電力系統(tǒng)保護(hù)與控制學(xué)術(shù)研討會(huì)論文集[C];2006年

9 陳奎;程培波;;基于接地故障類型的綜合選線研究[A];第十七屆全國(guó)煤礦自動(dòng)化學(xué)術(shù)年會(huì)、中國(guó)煤炭學(xué)會(huì)自動(dòng)化專業(yè)委員會(huì)學(xué)術(shù)會(huì)議論文集[C];2007年

10 ;某發(fā)電公司#01發(fā)電機(jī)轉(zhuǎn)子接地故障[A];《電站信息》2009年第1期[C];2009年

相關(guān)重要報(bào)紙文章 前6條

1 苑少軍 山西興能發(fā)電有限責(zé)任公司;接地故障分析[N];科學(xué)導(dǎo)報(bào);2009年

2 郭雷;查找配電線路接地故障有妙招[N];中國(guó)電力報(bào);2006年

3 國(guó)彬 陸遠(yuǎn)萍;直流系統(tǒng)接地故障的消除方法[N];中國(guó)電力報(bào);2004年

4 劉楠 駐馬店供電公司;小電流接地系統(tǒng)接地故障的分析和判別[N];駐馬店日?qǐng)?bào);2010年

5 李申偉 郁章偉;日照電網(wǎng)安裝線路監(jiān)測(cè)服務(wù)器[N];國(guó)家電網(wǎng)報(bào);2010年

6 成都 姚肇祺;居民住宅供電系統(tǒng)的保護(hù)性接地[N];電子報(bào);2001年

相關(guān)碩士學(xué)位論文 前10條

1 郭冠能;TV多點(diǎn)接地故障在線監(jiān)測(cè)的研究和應(yīng)用[D];華南理工大學(xué);2016年

2 裴e,

本文編號(hào):1403168


資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/1403168.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶ce735***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com