核電站除鹽水箱密封方案探究
發(fā)布時(shí)間:2018-01-09 04:14
本文關(guān)鍵詞:核電站除鹽水箱密封方案探究 出處:《給水排水》2017年S2期 論文類(lèi)型:期刊論文
【摘要】:核電站除鹽水分配系統(tǒng)設(shè)置有除鹽水箱,存儲(chǔ)除鹽水生產(chǎn)線(xiàn)出水,調(diào)節(jié)下游用水波動(dòng)。水箱與大氣相通,無(wú)密封措施,受空氣中CO_2等物質(zhì)影響,運(yùn)行一段時(shí)間后,水箱內(nèi)pH降低,電導(dǎo)率增大。分析幾種除鹽水箱密封技術(shù),探討適用于核電站除鹽水分配系統(tǒng)水箱的密封技術(shù)方法。
[Abstract]:The desalted water distribution system of nuclear power station is provided with desalination tank, which stores the effluent of desalting production line and regulates the fluctuation of downstream water. The water tank communicates with the atmosphere and has no sealing measures, which is influenced by CO_2 and other substances in the air. After running for a period of time, the pH in the tank decreases and the electrical conductivity increases. Several sealing techniques of desalted water tank are analyzed, and the sealing technology suitable for the water tank of desalted water distribution system in nuclear power station is discussed.
【作者單位】: 中國(guó)核電工程有限公司;廣安職業(yè)技術(shù)學(xué)院;
【分類(lèi)號(hào)】:TM623.4
【正文快照】: 根據(jù)《核電廠(chǎng)常規(guī)島設(shè)計(jì)規(guī)范》(GB/T 50958—2013),除鹽水箱總有效容積的設(shè)計(jì)應(yīng)滿(mǎn)足全廠(chǎng)所有機(jī)組事故狀態(tài)下反應(yīng)堆余熱排出所需的除鹽水量,并應(yīng)配合除鹽水處理系統(tǒng)滿(mǎn)足一臺(tái)機(jī)組啟動(dòng)、其余機(jī)組正常運(yùn)行時(shí)的除鹽水量要求。為滿(mǎn)足規(guī)范要求,在大部分二代核電站中,核島除鹽水分配
【相似文獻(xiàn)】
相關(guān)期刊論文 前2條
1 羅月;;某核電廠(chǎng)除鹽水箱焊接及防變形措施[J];科技與企業(yè);2012年12期
2 潘姚凡;劉忠;;核電站除鹽水箱內(nèi)部聚脲涂層缺陷應(yīng)對(duì)措施探討[J];全面腐蝕控制;2014年07期
,本文編號(hào):1399945
本文鏈接:http://sikaile.net/kejilunwen/dianlidianqilunwen/1399945.html
最近更新
教材專(zhuān)著