天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 科技論文 > 安全工程論文 >

近距離煤巖獨(dú)巷同向遞進(jìn)快速消突技術(shù)

發(fā)布時(shí)間:2018-07-14 15:34
【摘要】:為解決端氏煤礦集中回風(fēng)巷獨(dú)頭掘進(jìn)快速消突問題,借助近距離煤巖獨(dú)巷同向遞進(jìn)的開拓條件,采用順層孔和穿層孔立體交叉抽采技術(shù)全面控制防突區(qū)域。抽采期間為防治軌道大巷炮掘擾動破壞鉆孔,順層孔采用全孔段下放篩管以及穿層孔采用"破孔、透孔、分段封孔"三步走二次封孔的防突保障技術(shù),實(shí)現(xiàn)防突鉆孔高效、持久抽采。經(jīng)過區(qū)域預(yù)抽35~40 d后,集中回風(fēng)巷正前方和兩側(cè)15 m范圍內(nèi)煤體的殘余瓦斯含量均小于8 m~3/t,滿足區(qū)域防突效果檢驗(yàn)要求,實(shí)現(xiàn)獨(dú)頭煤巷快速消突,保障"抽、掘"平衡。
[Abstract]:In order to solve the problem of rapid outburst suppression in Duan's coal mine concentrated return air roadway, with the help of the development condition of close distance coal and rock single roadway in the same direction, the outburst prevention area is completely controlled by the technology of intersectional extraction of bedding hole and perforating hole. In order to prevent the disturbance and damage drilling of track roadway during extraction, the down-cut sieve pipe in the whole hole section and the "breaking hole, perforating hole, segmental sealing hole" technology are adopted in the down-layer hole to realize the high efficiency of anti-outburst drilling. Long-lasting extraction. After 35 ~ 40 days of regional pre-drainage, the residual gas content of coal is less than 8 m / 3 / t in front of and within 15 m range of both sides, which meets the requirements of regional anti-outburst effect test, realizes rapid outburst suppression in single-head coal roadway, and ensures "drainage and excavation" balance.
【作者單位】: 煤科集團(tuán)沈陽研究院有限公司;
【基金】:“十三五”國家大型油氣田及煤層氣開發(fā)科技重大專項(xiàng)資助項(xiàng)目(2016ZX05045-004-001)
【分類號】:TD713.3
,

本文編號:2122106

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/anquangongcheng/2122106.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶6ec16***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com