大西高速綜合試驗(yàn)段地震預(yù)警系統(tǒng)綜合試驗(yàn)及應(yīng)急演練順利完成
發(fā)布時(shí)間:2018-06-27 04:52
本文選題:綜合試驗(yàn)段 + 地震預(yù)警系統(tǒng) ; 參考:《中國鐵道科學(xué)》2017年04期
【摘要】:正2017年5月4日,隨著CRH-0507中國標(biāo)準(zhǔn)動(dòng)車組緩緩駛?cè)胄弥菸髡?我國鐵路具有完全自主知識(shí)產(chǎn)權(quán)的高速鐵路地震預(yù)警系統(tǒng)在大西高速綜合試驗(yàn)段的綜合試驗(yàn)任務(wù)圓滿完成。在大西高速綜合試驗(yàn)段進(jìn)行的高速鐵路地震預(yù)警系統(tǒng)綜合試驗(yàn)歷時(shí)2年,經(jīng)歷了設(shè)備安裝、聯(lián)調(diào)聯(lián)試、3次單臺(tái)站試
[Abstract]:On May 4, 2017, with the CRH-0507 Chinese standard EMU moving slowly into Xinzhou West Railway Station, the comprehensive test task of the high-speed railway earthquake warning system with completely independent intellectual property rights in Daxi High Speed Comprehensive Test Section has been successfully completed. The comprehensive test of earthquake early warning system of high-speed railway in Daxi high speed comprehensive test section lasted for 2 years, experienced installation of equipment, three single station tests in connection test.
【分類號(hào)】:U298
【相似文獻(xiàn)】
相關(guān)會(huì)議論文 前1條
1 李小和;陳占;趙勇;;武漢綜合試驗(yàn)段軟土地基處理施工與工后沉降評估[A];第十四屆中國科協(xié)年會(huì)第13分會(huì)場:軟土路基工程技術(shù)研討會(huì)論文集[C];2012年
相關(guān)重要報(bào)紙文章 前1條
1 通訊員唐海旭 郭永泉;武廣客運(yùn)專線綜合試驗(yàn)段完成通信信號(hào)聯(lián)調(diào)聯(lián)試[N];人民鐵道;2008年
,本文編號(hào):2072734
本文鏈接:http://sikaile.net/kejilunwen/anquangongcheng/2072734.html
最近更新
教材專著