基于BIM技術(shù)的化工建設(shè)項(xiàng)目全過(guò)程造價(jià)管理控制研究
[Abstract]:In the process of construction and development of chemical enterprises, according to the relevant statistics, due to various problems, the construction cost of the project exists a great waste, most of the project completion settlement will exceed the investment budget of the project, accompanied by the further improvement of the project management technology, With the rapid development of network information, the application of BIM technology and the concept of cost management in the whole process are also being further improved. BIM reduces the construction cost, shortens the construction period, improves the quality of the construction project, improves the production efficiency of the project, has three-dimensional rendering, publicity and display, and improves the accuracy of the calculation, the fast calculation, and the improvement of the precision, and it also plays a more and more important role in the whole life cycle of the project. Accurate planning, reduce waste; multi-calculation comparison, effective control; virtual construction, effective coordination; collision inspection, reduce rework; With the characteristics of conflict call, decision support and so on, BIM technology is introduced into chemical construction: it can avoid 40% of extrabudgetary changes, limit the accuracy of cost estimation to less than 3%, and reduce the time of cost estimation by 80%. On the basis of conflict resolution and discovery, the contract price can be reduced by 10%. Generally speaking, BIM has the core value characteristics of graphability, optimization, simulation and coordination. The whole process cost management based on BIM can satisfy the value orientation of the investment estimation, make the investment estimate proceed according to the module, make the investment estimate have reasonable value, and provide more accurate reference for the construction cycle of the project. In the stage of design budget estimate, it can improve the accuracy and accuracy of calculation, ensure the coordination of design, ensure the smooth availability of information, reduce the unnecessary change cost in the later stage, and control the cost. In the bidding control stage, it provides a more accurate list of bidding workload and bidding control price, facilitates the payment and application of project progress funds in the contract implementation stage, minimizes design changes, and controls the waste of material costs. The completion and settlement stage can reduce the manual workload and save the settlement time, so that the management objectives of each stage can be realized, the total cost can be controlled, and the investment efficiency of the project can be improved. In this paper, the whole process cost management control and application based on BIM technology are explained and analyzed in detail. Although BIM has obvious advantages, its function has not yet formed a more mature mechanism for the construction field of our country, especially for chemical architecture, and lacks of government intervention and industry standards. at the same time, the concept and consciousness of BIM in the construction industry as a whole lags behind. The driving force of BIM application is obviously insufficient, the localization of BIM technology and software is restricted, and the professionals based on BIM cost management ability are seriously lack. Based on this, in the face of information technology and Internet development today, this topic tries to explore the application of BIM technology in the chemical construction of enterprises, and further analyzes how enterprises produce in chemical industry. Design and installation of BIM technology to achieve the sharing and integration of information; How to allocate all kinds of resources through BIM to realize the upgrading and development of production capacity and process optimization, at the same time, how to control the cost well and realize the data system of visual control, so as to improve the market competitiveness of chemical enterprises. So as to effectively achieve sustainable development and green building.
【學(xué)位授予單位】:石河子大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:TU723.3;TU17
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 成彥惠;何棟梁;;基于BIM技術(shù)的項(xiàng)目前期投資估算指標(biāo)體系的設(shè)立方法探析[J];中國(guó)高新技術(shù)企業(yè);2016年32期
2 夏丹丹;;略論當(dāng)代機(jī)電工程施工中現(xiàn)存問(wèn)題及發(fā)展趨勢(shì)[J];黑龍江科技信息;2016年09期
3 雷仕民;李飛;劉賢松;;BIM技術(shù)在化工裝置中的應(yīng)用[J];安裝;2016年03期
4 王宇輝;;試論建設(shè)單位全過(guò)程造價(jià)管理的有效策略[J];居業(yè);2015年20期
5 計(jì)凌峰;;建筑信息模型(BIM)技術(shù)在我國(guó)現(xiàn)狀及障礙研究[J];江西建材;2015年19期
6 汪士和;徐金保;;民營(yíng)建筑業(yè)企業(yè)的困境與出路[J];建筑;2015年18期
7 彭蔚;;BIM在建設(shè)工程造價(jià)管理中的適用性分析[J];工程經(jīng)濟(jì);2015年06期
8 朱正;;機(jī)電管家—基于物聯(lián)網(wǎng)的機(jī)電工程運(yùn)行監(jiān)控管理系統(tǒng)[J];安裝;2015年01期
9 陳茜;張英;;招標(biāo)控制價(jià)BIM標(biāo)準(zhǔn)研究[J];價(jià)值工程;2014年25期
10 汪茵;高平;宋蓉;;BIM在工程前期造價(jià)管理中的應(yīng)用研究[J];建筑經(jīng)濟(jì);2014年08期
相關(guān)碩士學(xué)位論文 前2條
1 徐世杰;基于BIM技術(shù)的項(xiàng)目建設(shè)管理應(yīng)用研究[D];浙江工業(yè)大學(xué);2015年
2 吳江明;陶氏化學(xué)在中國(guó)市場(chǎng)品牌競(jìng)爭(zhēng)力的分析[D];上海交通大學(xué);2008年
,本文編號(hào):2474641
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/2474641.html