既有無粘結(jié)預(yù)應(yīng)力鋼絞線重錨截斷技術(shù)研究與實踐
[Abstract]:With the changing of urban planning, many existing buildings, in order to meet the development of urban construction or new requirements on the use function, need to be modified or removed in the part where there is no pre-stressed pre-stressed floor or the part that does not meet the use requirement in the overall structure, In order to meet the new demands of the building, the existing prestressed reinforcement needs to be cut off. However, the conventional construction process is to cut the pre-stressed bar directly, which can lead to a large potential safety hazard in the original building during the construction period due to the excessive prestress loss. This situation requires the use of a specially-made open anchorage. Based on the experimental research and practice, this paper presents an innovative construction method for reconstructing the heavy anchor of a steel strand with a non-bonded pre-stressed concrete structure, and in the course of the transformation, it is possible to maintain the pre-stress of the original structure without loss or loss. The key to the construction method is to develop a simple and efficient open anchorage device, which is a tool anchor (in-cup thread) and a working anchor (double-clip in the cup), and the working anchor is a permanent anchorage device, and the tool anchor is a reusable tool anchor. In this paper, the static test, the long-term anchorage test, the repeated load test and the steel strand cut-off test are carried out for the open anchorage. In order to study the internal force and deformation of the open anchorage structure before and after the cut-off of the floor, and the stress change before and after the cut-off of the steel strand, the finite element ABAQUS software is used to simulate the three-dimensional nonlinear numerical simulation of the open anchorage and the steel strand, and the stress distribution of the open anchorage and the steel strand before and after the cut-off is mainly studied. Combined with the concrete test and the finite element theory analysis, the concrete construction method of the existing non-bonded pre-stressed concrete structure modified steel strand reanchor construction is introduced in detail, and the construction of the podium building of the Huiyuan Building is information-controlled. The theoretical analysis shows that the results of the finite element simulation of the open anchorage device with non-bonded pre-stressed steel strand are in good agreement with the experimental results. The test research and engineering practice show that the work anchor and the tool anchor should be used in combination to achieve the best anchoring effect when the steel strand is cut off. It is preferable that the two tool anchors are used with one working anchor, and the tool anchor can be used repeatedly after the cutting is completed. Combined with the demolition of the podium building of the Changsha Huiyuan Building, the construction method and the information monitoring scheme of the existing non-bonded pre-stressed steel strand heavy-anchor cutting technology are put forward.
【學(xué)位授予單位】:中南林業(yè)科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TU757
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 高友長;高巖;;淺析鋼絞線張拉常見故障及處理措施[J];西部探礦工程;2007年07期
2 徐戊己,余坪;鋼絞線在預(yù)應(yīng)力橋中的應(yīng)用[J];四川建筑科學(xué)研究;1988年03期
3 蔣婷;;淺析后張梁鋼絞線張拉的三控[J];現(xiàn)代企業(yè)教育;2012年05期
4 周瑩鋒;;確保橋梁預(yù)應(yīng)力鋼絞線張拉質(zhì)量[J];福建建筑;2008年02期
5 周瑩鋒;;提高橋梁預(yù)應(yīng)力鋼絞線張拉合格率[J];福建建材;2013年05期
6 張玉中,梅思才,潘國強;鋼絞線張拉常見故障分析[J];橋梁建設(shè);2001年04期
7 王寶奎,蘭照滿,王長在,李俊生;鋼絞線余料做吊環(huán)的受力分析和制作[J];內(nèi)蒙古公路與運輸;2001年03期
8 林壯宏;劉吉福;趙杰雄;關(guān)鍵;;某公路橋連續(xù)箱梁鋼絞線拉力不足原因分析及處理[J];廣東公路交通;2010年03期
9 張慶華;;吊架式張拉法在T梁正彎矩鋼絞線張拉施工中的應(yīng)用[J];鐵道建筑技術(shù);2013年01期
10 任悟遠(yuǎn);冷拔低炭鋼絞線在預(yù)應(yīng)力混凝土中的應(yīng)用[J];建筑技術(shù)通訊(施工技術(shù));1980年04期
相關(guān)會議論文 前10條
1 苑仁安;;無應(yīng)力狀態(tài)法在鋼絞線斜拉索中的應(yīng)用[A];第二十屆全國橋梁學(xué)術(shù)會議論文集(上冊)[C];2012年
2 ;VSL鋼絞線斜拉索體系索力均衡性研究[A];中國公路學(xué)會橋梁和結(jié)構(gòu)工程學(xué)會2002年全國橋梁學(xué)術(shù)會議論文集[C];2002年
3 ;VSL鋼絞線斜拉索體系可靠性研究[A];中國公路學(xué)會橋梁和結(jié)構(gòu)工程學(xué)會2002年全國橋梁學(xué)術(shù)會議論文集[C];2002年
4 龍躍;吳秋凡;黃芳瑋;;OVM200鋼絞線群錨斜拉索的構(gòu)造及施工工藝[A];中國土木工程學(xué)會橋梁及結(jié)構(gòu)工程學(xué)會第十二屆年會論文集(上冊)[C];1996年
5 ;VSL SSI 2000鋼絞線斜拉索技術(shù)及其在國內(nèi)大跨度橋梁工程中的應(yīng)用經(jīng)驗[A];中國公路學(xué)會橋梁和結(jié)構(gòu)工程學(xué)會2002年全國橋梁學(xué)術(shù)會議論文集[C];2002年
6 張保和;王魯麓;李傳磊;李忠東;;廣州白云機場擴建工程SGP-SC鋼絞線拉索體系的應(yīng)用[A];第二屆全國鋼結(jié)構(gòu)施工技術(shù)交流會論文集[C];2008年
7 楊廷軍;;先張法預(yù)應(yīng)力鋼絞線張拉計算及控制[A];開拓進(jìn)取 再創(chuàng)輝煌——貴州省公路學(xué)會2008年技術(shù)交流論文集[C];2008年
8 李傳平;Pelle Gustafsson;張保和;;VSL SSI 2000鋼絞線斜拉索體系的特點及運用[A];中國公路學(xué)會橋梁和結(jié)構(gòu)工程學(xué)會2001年橋梁學(xué)術(shù)討論會論文集[C];2001年
9 毛文華;邱紅霞;姬艷春;;裝配式空心板橋加固改造——橫向體外預(yù)應(yīng)力鋼絞線施工工藝與質(zhì)量控制研究[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2005)[C];2005年
10 任海波;亢景付;;基于ANSYS的隧洞環(huán)錨預(yù)應(yīng)力混凝土襯砌計算研究[A];第三屆全國巖土與工程學(xué)術(shù)大會論文集[C];2009年
相關(guān)博士學(xué)位論文 前1條
1 張卓杰;大跨度橋梁索結(jié)構(gòu)絲股分離與滑移機理及其力學(xué)行為的研究[D];華南理工大學(xué);2016年
相關(guān)碩士學(xué)位論文 前10條
1 常誠;平行鋼絞線索的精確量測分析[D];長安大學(xué);2015年
2 李仁超;后張法孔道灌漿缺陷下鋼絞線銹蝕研究[D];哈爾濱工業(yè)大學(xué);2015年
3 李闖;超大噸位鋼絞線斜拉索錨具力學(xué)性能研究及應(yīng)用[D];重慶交通大學(xué);2015年
4 王象良;預(yù)應(yīng)力錨具及鋼絞線試驗研究與分析[D];大連理工大學(xué);2016年
5 丁衍然;超低溫環(huán)境下鋼絞線線膨脹系數(shù)與應(yīng)力松弛試驗研究[D];天津大學(xué);2016年
6 陳磊;既有無粘結(jié)預(yù)應(yīng)力鋼絞線重錨截斷技術(shù)研究與實踐[D];中南林業(yè)科技大學(xué);2017年
7 聶治盟;超低溫環(huán)境下鋼絞線與混凝土及水泥漿粘結(jié)性能試驗研究[D];天津大學(xué);2012年
8 趙云鵬;基于頻率法的平行鋼絞線斜拉索索力測試研究[D];鄭州大學(xué);2013年
9 林加惠;鋼絞線網(wǎng)片—聚合物砂漿加固RC梁受彎性能試驗研究[D];華僑大學(xué);2014年
10 周輝;復(fù)合FRP-OFBG的索式智能結(jié)構(gòu)研究和工程應(yīng)用[D];哈爾濱工業(yè)大學(xué);2008年
,本文編號:2459810
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/2459810.html