喀麥隆社會住房EPC總承包項目風(fēng)險管理研究
[Abstract]:With the rapid development of Chinese economy, the process of overseas construction expansion in Chinese construction industry has been accelerated and strengthened. Similarly, the international engineering contracting market has put forward higher and higher requirements for the management and development of enterprises. Due to many factors, such as comprehensive benefit, resource allocation and owner's tendency, EPC general contracting mode has gradually become the mainstream mode in international engineering. At present, many scholars and engineers engaged in project management research at home and abroad have strengthened their research work on the EPC model. Compared with the domestic market, the risk factors in the international engineering market are more and the situation is more complex. Therefore, the use of effective means to avoid the corresponding risks will be the key to determine whether Chinese construction enterprises can stand undefeated in the international engineering contracting market. From the point of view of project management, the EPC model can make the responsibility of all parties involved in the project more clear and ensure the quality of the project effectively. The EPC model can liberate the owner from the complicated and trivial project management, and the EPC model can also make the contractor gain more profit opportunities. However, large profits are accompanied by great risks, and the profits and rights of the general contractor will be increased under the EPC model, and the risk probability of the project will be greatly increased, which is why, In the field of architecture, problems are often encountered in the use of the EPC model. In this paper, the EPC model is deeply analyzed, and the risk of the EPC model of Cameroon social housing project is identified according to the risk management process, and the main risks are analyzed. And according to the EPC each stage carries on the key analysis to the project risk. By using the expert scoring method and the Analytic hierarchy process (AHP), the weight of each risk factor in the EPC model is determined, and the degree of influence of each risk factor on the project is divided according to the ranking result of the risk hierarchy. Finally, the solutions to the risks in each project stage are given one by one.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:F426.92;F125
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 謝有仁;;國際EPC工程設(shè)備物資采購風(fēng)險及對策[J];企業(yè)改革與管理;2016年21期
2 高廣學(xué);;海外EPC電站項目物資采購面臨的風(fēng)險及對策研究[J];中小企業(yè)管理與科技(中旬刊);2016年07期
3 朱圳;;孟加拉某電廠EPC項目的采購風(fēng)險管理[J];項目管理技術(shù);2016年07期
4 高慧;王宗軍;;EPC模式下總承包商風(fēng)險防范研究[J];工程管理學(xué)報;2016年01期
5 李勇;;談電力工程EPC總承包項目風(fēng)險管理[J];山西建筑;2015年01期
6 桑培東;張大鵬;;基于風(fēng)險矩陣的印度EPC電站項目風(fēng)險與對策研究[J];工程建設(shè)與設(shè)計;2014年11期
7 劉光忱;孫磊;趙曼;;基于EPC模式下總承包商項目風(fēng)險管理研究[J];沈陽建筑大學(xué)學(xué)報(社會科學(xué)版);2012年01期
8 張建成;彭反霸;;水電工程EPC項目總承包商全面風(fēng)險管理研究[J];水電能源科學(xué);2011年09期
9 范瑞琛;;EPC工程總承包模式下的風(fēng)險防范[J];鐵路工程造價管理;2011年02期
10 胡金洲;;EPC工程總承包模式下的風(fēng)險分析及防范[J];黑龍江科技信息;2011年06期
相關(guān)碩士學(xué)位論文 前10條
1 徐慧聲;基于工程總承包商視角下的EPC項目合同風(fēng)險分析與防范研究[D];天津理工大學(xué);2016年
2 李龍飛;A公司EPC海外電力工程項目的質(zhì)量管理研究[D];北京化工大學(xué);2015年
3 李媛;EPC合同發(fā)包人法律風(fēng)險分析及對策研究[D];對外經(jīng)濟(jì)貿(mào)易大學(xué);2015年
4 李雅珍;海外EPC項目集成化風(fēng)險管理研究[D];華東理工大學(xué);2016年
5 靳海麟;中國建筑施工企業(yè)在EPC模式下投標(biāo)決策風(fēng)險研究[D];吉林大學(xué);2015年
6 王東;海外EPC總承包項目風(fēng)險管理研究[D];華南理工大學(xué);2014年
7 吳芳;EPC模式下某海外工程承包商風(fēng)險評價與控制[D];武漢理工大學(xué);2014年
8 黃福;海外EPC工程項目風(fēng)險管理研究[D];廣西大學(xué);2013年
9 張蕙;海外水電EPC項目風(fēng)險管控機(jī)制研究[D];華北電力大學(xué);2013年
10 溫炳鈺;模糊層次分析法在國際EPC電站項目風(fēng)險評價的應(yīng)用研究[D];河北工程大學(xué);2013年
,本文編號:2411080
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/2411080.html