建筑方案設(shè)計(jì)階段理性控制程序研究
[Abstract]:With the increasingly fierce competition in the construction industry in China, more and more attention has been paid to how to control the quality of the building scheme stably in the design stage. However, scientific design procedures and practices are the key factors to determine the quality of the products. At the same time, the research on the theory of product quality design control has made great progress, and it also provides a new optimization platform and improvement tools for the systematic study of architectural design procedures. Based on the process of architectural project design and the workflow of practical project in the process of investigation and practice, this study attempts to establish a systematic paradigm of architectural design procedure with wide possibilities. The PDCA cycle model is used to verify the rationality of the paradigm. A scientific and systematic design procedure is of great significance to reduce the work cost, solve the design problems and strengthen the interaction between the design stages, and then stabilize and control the quality of the architectural design scheme. Through literature investigation, this study combs the development course of architectural design program research at home and abroad, and summarizes the relative deficiency of the current conventional architectural design process by combining with the research practice. The "PDCA cycle model" in the theory of product quality design control is selected as the systematic improvement tool of the design program, and its working mechanism and practical application are described. Combined with systematic methodology in systems science, the systematic research framework of design procedure is built. In the early stage of the thesis research, three representative architectural design units were selected to investigate and practice, according to their specific practical projects, through recording the work process, sorting out the stage design results, making design program case samples. And carry on the research and analysis to it in the systematic research frame. Then, the "cycle process" and "design steps" of each program sample are compared and analyzed vertically and horizontally by using comparative research method. On this basis, the systematic paradigm of architectural design procedure is put forward. Through the analysis of the internal cycle process and the specific design steps, it can be seen that the paradigm accords with the working mechanism and general systematization principle of "PDCA cycle model". Is a scientific, systematic architectural design program. The systematized paradigm of architectural design procedure is aimed at the stage of architectural scheme design, and has extensive adaptability, not for a specific type of architectural design. In the actual working process, we can adjust the design units according to their own characteristics and project types, design cycle and the depth of project requirements. It has positive practical significance for guiding the design flow of the building scheme, solving the problems in the design process and controlling the quality of the building scheme stably. Finally, the relative limitations of the study and the future development trend are summarized.
【學(xué)位授予單位】:山東建筑大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TU201
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 金坤;閔天怡;唐葆亨;;地方與人文的傳承——金華市體育中心建筑方案設(shè)計(jì)[J];新建筑;2010年05期
2 馬蓉;;快速建筑方案設(shè)計(jì)的幾點(diǎn)體會[J];科技資訊;2012年22期
3 龔國煜;;基于建筑方案設(shè)計(jì)的重要性分析與應(yīng)用[J];中國新技術(shù)新產(chǎn)品;2013年10期
4 ;關(guān)于印發(fā)《城市建筑方案設(shè)計(jì)競選管理試行辦法》的通知[J];建筑設(shè)計(jì)管理;1995年04期
5 蔡長賡;建設(shè)部印發(fā)《城市建筑方案設(shè)計(jì)競選管理試行辦法》[J];住宅科技;1995年11期
6 鄧啟立;;談建筑方案設(shè)計(jì)[J];山西建筑;2014年02期
7 龔小卉;;百歲大廈建筑方案設(shè)計(jì)解析[J];工程設(shè)計(jì)與研究;2006年02期
8 薛晨璽;;論建筑方案設(shè)計(jì)方法[J];山西建筑;2010年35期
9 潘國明;陳躍;胡凱;;建筑方案設(shè)計(jì)方法探析[J];低溫建筑技術(shù);2012年02期
10 程學(xué)四;曹煒;;謝稚柳陳佩秋藝術(shù)館概念建筑方案設(shè)計(jì)[J];中國建筑裝飾裝修;2012年10期
相關(guān)重要報(bào)紙文章 前1條
1 記者 羅正遠(yuǎn);廣安國際商業(yè)中心舉行建筑方案設(shè)計(jì)招標(biāo)說明會[N];廣安日報(bào);2009年
相關(guān)碩士學(xué)位論文 前3條
1 高恒;BIM在建筑方案設(shè)計(jì)過程中的應(yīng)用研究[D];江蘇大學(xué);2016年
2 劉明凱;建筑方案設(shè)計(jì)階段理性控制程序研究[D];山東建筑大學(xué);2017年
3 翟建宇;BIM在建筑方案設(shè)計(jì)過程中的應(yīng)用研究[D];天津大學(xué);2014年
,本文編號:2382945
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/2382945.html