昆明某環(huán)境復(fù)雜閑置基坑長期變形分析與控制
[Abstract]:With the development of urbanization in China, urban underground space has been developed unprecedentedly, and foundation pit engineering has emerged in large numbers. The foundation pit construction will break the initial stress equilibrium state of the site, cause the deformation of the enclosure structure, the surface settlement and the displacement of the surrounding soil, which will have a negative impact on the surrounding environment. As a temporary supporting structure, the design life of foundation pit support is generally short. But the construction may be stopped for a long time due to the shortage of funds and design changes, forming idle foundation pit. As a result of soil creep, humidification, dewatering and consolidation, concrete creep and other factors, the foundation pit deformation increases with the increase of idle time, that is, the foundation pit deformation has a time effect. The time effect will aggravate the potential threat to the surrounding environment safety caused by foundation pit engineering. In this paper, a deep and large foundation pit with complex idle inner braces in Kunming is taken as the research object. The long-term deformation of the foundation pit is analyzed by three-dimensional numerical simulation. According to the results of model analysis and field investigation, the deformation control measures of foundation pit are put forward. Finally, numerical method is used to analyze the reinforcement effect. The main research contents are as follows: (1) the three-dimensional numerical model of foundation pit, underground continuous wall and subway structure is established. The reliability of the model is verified by comparing the results of model calculation and field monitoring data. (2) from the aspects of soil creep, humidification, dewatering and consolidation, concrete creep, the influencing factors and mechanism of long-term deformation of foundation pit are analyzed. Then a simplified method for analyzing the required soil mass and reinforced concrete bracing strength parameters is established. (3) the strength parameters of the soil and bracing structure after foundation pit is idle are obtained by the test method. A global time-varying model considering time effect is established by using finite element method. The whole excavation process before and after foundation pit idling is simulated by three-dimensional numerical simulation. The results are compared with the results of time-invariant model without time effect. The long-term deformation characteristics of foundation pit and its influence on the deformation of surrounding subway structure are analyzed. (4) based on the results of time-varying model, the potential safety risk of foundation pit itself and surrounding environment during idle period is analyzed. The long-term deformation control measures of foundation pit are put forward and the reliability of reinforcement measures is analyzed.
【學(xué)位授予單位】:昆明理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TU753
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 潘軍;楊小平;劉庭金;;緊鄰地鐵半圓內(nèi)支撐深基坑受力及變形特性數(shù)值研究[J];科學(xué)技術(shù)與工程;2015年32期
2 帥紅巖;陳少平;曾執(zhí);;深基坑支護(hù)結(jié)構(gòu)變形特征的數(shù)值模擬分析[J];巖土工程學(xué)報(bào);2014年S2期
3 應(yīng)宏偉;孫威;呂蒙軍;陳東;;復(fù)雜環(huán)境下某深厚軟土基坑的實(shí)測(cè)性狀研究[J];巖土工程學(xué)報(bào);2014年S2期
4 廖少明;魏仕鋒;譚勇;柳駿茜;;蘇州地區(qū)大尺度深基坑變形性狀實(shí)測(cè)分析[J];巖土工程學(xué)報(bào);2015年03期
5 劉念武;龔曉南;俞峰;房凱;;內(nèi)支撐結(jié)構(gòu)基坑的空間效應(yīng)及影響因素分析[J];巖土力學(xué);2014年08期
6 周冠南;;軟弱地層深基坑開挖時(shí)空效應(yīng)分析及控制[J];地下空間與工程學(xué)報(bào);2014年S1期
7 劉念武;龔曉南;樓春暉;;軟土地基中地下連續(xù)墻用作基坑圍護(hù)的變形特性分析[J];巖石力學(xué)與工程學(xué)報(bào);2014年S1期
8 廖超;賀躍光;;地下連續(xù)墻與內(nèi)支撐復(fù)合支護(hù)深基坑的FLAC模擬[J];福建建筑;2013年12期
9 張顥繽;趙延林;;支護(hù)形式對(duì)基坑近鄰建筑物沉降影響分析[J];山西建筑;2013年34期
10 樓春暉;夏唐代;劉念武;;軟土地區(qū)基坑中SMW圍護(hù)樁變形性狀研究[J];巖土工程學(xué)報(bào);2013年S2期
相關(guān)會(huì)議論文 前2條
1 劉暢;孫盼盼;趙歆;梁奉林;;基坑反壓土?xí)r間效應(yīng)影響的有限元分析[A];中國土木工程學(xué)會(huì)第十二屆全國土力學(xué)及巖土工程學(xué)術(shù)大會(huì)論文摘要集[C];2015年
2 陸培炎;熊麗珍;楊光華;陳海新;;高層建筑深基坑開挖中的土、樁(墻)共同作用的分析計(jì)算[A];高層建筑與橋梁基礎(chǔ)工程學(xué)術(shù)會(huì)議論文集[C];1989年
相關(guān)博士學(xué)位論文 前1條
1 胡狄;預(yù)應(yīng)力混凝土橋梁徐變效應(yīng)分析[D];中南大學(xué);2003年
相關(guān)碩士學(xué)位論文 前1條
1 曹延海;鹽水坳隧道開挖過程的數(shù)值模擬分析[D];長安大學(xué);2012年
,本文編號(hào):2328672
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/2328672.html