軟土區(qū)基坑預(yù)降水引起支護(hù)墻側(cè)移的典型參數(shù)影響研究
[Abstract]:Based on the hydrogeological conditions of the site where the permeable and weakly permeable layers alternately occur in Tianjin, a large number of numerical calculations are compared with the engineering measurements, and a nonlinear regression analysis is combined. The influence of parameters such as pre-precipitation time (t), pre-precipitation depth (H _ d), foundation pit length and width (L) and foundation pit width (b) on the lateral displacement of retaining wall in the process of pre-dewatering is studied. With the extension of t, the lateral displacement 未 _ (hm) of the maximum retaining wall increases with a decreasing nonlinear growth rate. During the first few days of pre-precipitation, the lateral displacement of the retaining wall can take up a large proportion of the stable lateral shift in the pre-precipitation process. Secondly, Hd has an important influence on the development of 未 _ (hm) and the depth of cantilever shift of retaining wall. In general, 未 _ (hm) and Hac increase with the increase of Hd, specifically, When Hd reaches the second permeable layer (after), the linear increase of 未 _ (hm) with HSCD is small (large), and the growth of HSCC is close to (obviously faster) that of Hd before (after) Hd reaches half thickness of deep weak permeable layer in the field. In addition, for the same width b foundation pit, when the foundation pit length L reaches a certain degree, the side angle effect of foundation pit length caused by pre-dewatering always occurs within a certain range of distance between the two sides of the pit, and during the pre-dewatering process, If the deformation of supporting wall needs to be strictly controlled, the ratio of S _ (cw) to b of the adjacent transverse partition can be within 4, or S _ (cw) / H _ d is less than 3.7, the maximum support wall lateral displacement caused by pre-dewatering can be reduced by using the side angle effect of foundation pit.
【作者單位】: 湖南科技大學(xué)巖土工程穩(wěn)定控制與健康監(jiān)測(cè)湖南省重點(diǎn)實(shí)驗(yàn)室;天津大學(xué)濱海土木工程結(jié)構(gòu)與安全教育部重點(diǎn)實(shí)驗(yàn)室;廣西大學(xué)工程防災(zāi)與結(jié)構(gòu)安全教育部重點(diǎn)實(shí)驗(yàn)室;
【基金】:國(guó)家自然科學(xué)基金項(xiàng)目(No.51308209,No.51578164,No.51708206,No.11602083) 濱海土木工程結(jié)構(gòu)與安全教育部重點(diǎn)實(shí)驗(yàn)室開(kāi)放課題(No.2017-KF03) 湖南省自然科學(xué)基金項(xiàng)目(No.2016JJ6044) 湖南省教育廳項(xiàng)目(No.15C0557)~~
【分類號(hào)】:TU753
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王桂芳;用力矩一次分配法直接求有側(cè)移剛架的端矩[J];土木工程學(xué)報(bào);1958年06期
2 陳府祥;;復(fù)雜排架的側(cè)移和影響矩陣[J];固體力學(xué)學(xué)報(bào);1985年02期
3 楊蔭曾;;論側(cè)移分配[J];內(nèi)蒙古農(nóng)牧學(xué)院學(xué)報(bào);1986年06期
4 朱杰江,徐道遠(yuǎn),王潁;框架側(cè)移的連續(xù)化模型分析[J];河海大學(xué)學(xué)報(bào)(自然科學(xué)版);2001年01期
5 劉書(shū)智;蔣琳;楊占峰;;框架結(jié)構(gòu)頂部側(cè)移的簡(jiǎn)化計(jì)算[J];建筑結(jié)構(gòu);2006年10期
6 張洪清;;關(guān)于用卡尼法計(jì)算有側(cè)移多層剛架收斂速度的初步探討[J];華北水利水電學(xué)院學(xué)報(bào);1983年01期
7 許報(bào)力;有側(cè)移剛架和無(wú)側(cè)移剛架的統(tǒng)一計(jì)算[J];四川建筑科學(xué)研究;1985年04期
8 石嘉元;;柱軸向變形引起高層框架水平側(cè)移的分析[J];建筑結(jié)構(gòu);1988年03期
9 李復(fù)周;單跨多層規(guī)則剛架在側(cè)向力作用下的側(cè)移變位規(guī)律[J];四川建材學(xué)院學(xué)報(bào);1989年03期
10 吳邦達(dá);框架側(cè)移近似計(jì)算新法[J];建筑結(jié)構(gòu);1996年11期
相關(guān)會(huì)議論文 前10條
1 劉光好;趙廣鑒;;剛架參考彎矩圖解法的側(cè)移問(wèn)題[A];第十一屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅰ卷[C];2002年
2 潘建伍;;用數(shù)字特征微分方程計(jì)算多層織造廠房側(cè)移量[A];第十二屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅱ冊(cè)[C];2003年
3 高華東;潘東旭;魏建文;樊紹峰;;混沌理論與支持向量機(jī)相結(jié)合的側(cè)移預(yù)測(cè)模型[A];第三屆全國(guó)巖土與工程學(xué)術(shù)大會(huì)論文集[C];2009年
4 徐偉良;蔣菡;李輝;;無(wú)側(cè)移柔性連接鋼框架的簡(jiǎn)化分析[A];第九屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅱ卷[C];2000年
5 徐彬;梁?jiǎn)⒅?;奇異函數(shù)建立側(cè)移剛度矩陣的新方法[A];第十屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅲ卷[C];2001年
6 王立明;高廣運(yùn);郭院成;;單支點(diǎn)樁錨支護(hù)結(jié)構(gòu)的側(cè)移計(jì)算[A];上海軟土地區(qū)深基坑技術(shù)新進(jìn)展研討會(huì)論文集[C];2005年
7 邵皖予;董朝旭;;高層建筑結(jié)構(gòu)在水平荷載作用下的側(cè)移計(jì)算[A];河南省土木建筑學(xué)會(huì)2009年學(xué)術(shù)年會(huì)論文集[C];2009年
8 查曉雄;王璐璐;鐘善桐;;構(gòu)建多層集裝箱改造房的方法及確保其安全性實(shí)用公式推導(dǎo)[A];第二屆全國(guó)工程結(jié)構(gòu)抗震加固改造技術(shù)交流會(huì)論文集[C];2010年
9 童根樹(shù);;按照整層模式失穩(wěn)的框架穩(wěn)定性計(jì)算[A];鋼結(jié)構(gòu)工程研究(六)——中國(guó)鋼結(jié)構(gòu)協(xié)會(huì)結(jié)構(gòu)穩(wěn)定與疲勞分會(huì)2006年學(xué)術(shù)交流會(huì)論文集[C];2006年
10 吳海洋;陳思作;;桅桿結(jié)構(gòu)中心柱在柱頂水平力作用下最大側(cè)移的計(jì)算[A];第14屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集(第一冊(cè))[C];2005年
相關(guān)博士學(xué)位論文 前1條
1 章麗莎;濱海地區(qū)地下水位變化對(duì)地基及基坑滲流特性的影響研究[D];浙江大學(xué);2017年
相關(guān)碩士學(xué)位論文 前10條
1 談龍;高層密集框桁架倉(cāng)儲(chǔ)結(jié)構(gòu)力學(xué)性能研究[D];東南大學(xué);2015年
2 劉小花;多高層鋼框架二階側(cè)移限值合理取值的研究[D];湖南大學(xué);2008年
3 陳筱妹;考慮柱端時(shí)變側(cè)移的約束混凝土柱耐火性能研究[D];華南理工大學(xué);2012年
4 蔡瀟霄;立體停車結(jié)構(gòu)基于整體側(cè)移的構(gòu)件截面確定方法[D];湖南大學(xué);2013年
5 林鵬;鋼框架結(jié)構(gòu)二階側(cè)移計(jì)算簡(jiǎn)化方法及二階側(cè)移限值合理取值的初步探討[D];湖南大學(xué);2006年
6 韓玉來(lái);轉(zhuǎn)換層層間側(cè)移角比界限值范圍分析[D];哈爾濱工程大學(xué);2004年
7 寇素霞;考慮豎向荷載影響的框架層間彈性側(cè)移計(jì)算[D];東北林業(yè)大學(xué);2004年
8 李宗藝;基坑施工對(duì)臨近地鐵隧道襯砌結(jié)構(gòu)的影響及控制措施[D];鄭州大學(xué);2017年
9 王琨;某鋼結(jié)構(gòu)仿古塔中支撐的抗側(cè)移性能及經(jīng)濟(jì)性分析[D];太原理工大學(xué);2012年
10 陳志衛(wèi);支撐及其布置對(duì)鋼結(jié)構(gòu)體系抗側(cè)移性能的影響的研究[D];西安理工大學(xué);2006年
,本文編號(hào):2248279
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/2248279.html