某山地風(fēng)電項(xiàng)目后評(píng)價(jià)研究
[Abstract]:The development of renewable energy, such as wind power, is an important energy strategic decision made by the country, and is also the objective requirement of sustainable economic and social development in China. Actively promoting the development of wind power is of great significance to adjust the national energy structure, ensure energy security, promote energy saving and emission reduction, and protect the ecological environment. The post-project evaluation is based on the development strategy of the national economy and the requirements of the electric power development planning, combined with the theory of post-evaluation of the electric power construction project and the actual project of wind farm construction, through the comparison between the actual statistics of the running wind power project and the preliminary calculation. Analyze deviation, sum up experience, promote the objectivity of project feasibility study and pre-evaluation, in order to improve the level of project investment management. This paper carries out a post evaluation study on a mountain wind power project, and through field investigation, determines the influencing factors of the mountain wind power project evaluation, respectively from the aspects of project technology, project management, project economy and so on, and analyzes the impact factors of the mountain wind power project evaluation from the aspects of project technology, project management, project economy, etc. This paper puts forward the post evaluation index system of the mountain wind power project, establishes the project post evaluation model and method, carries on the post evaluation to the first stage 49.5MW construction project of the mountain wind farm, and puts forward the related improvement and development suggestion according to the evaluation conclusion. The results further prove the importance of the post evaluation of wind power projects, and it is necessary to popularize the post evaluation of wind power projects to more wind power projects. On the other hand, this paper puts forward some deficiencies and needs further improvement in the construction project of the project, which provides an effective way and theoretical reference for further improving the economic benefit of the mountain wind power project.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:F426.61;TU71
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 楊龍;;電網(wǎng)投資項(xiàng)目全過(guò)程后評(píng)價(jià)體系研究[J];科技與企業(yè);2015年14期
2 胡殿剛;張雪佼;陳乃仕;張軍;余泳;;新能源發(fā)電項(xiàng)目多維度后評(píng)價(jià)方法體系研究[J];電力系統(tǒng)保護(hù)與控制;2015年04期
3 康海云;杭乃善;盧橋;詹厚劍;康海兵;成煜;蘇毅;;分布式光伏發(fā)電在智能電網(wǎng)中的作用分析[J];電網(wǎng)與清潔能源;2013年10期
4 孫麗麗;;淺析項(xiàng)目后評(píng)價(jià)在水利工程中的應(yīng)用[J];科技創(chuàng)新與應(yīng)用;2013年18期
5 張念木;胡連興;郭建欣;;水電工程后評(píng)價(jià)的綜合評(píng)價(jià)方法研究[J];天津大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2013年01期
6 郭玉瓊;;基于模糊神經(jīng)網(wǎng)絡(luò)成功度法的水電建設(shè)項(xiàng)目經(jīng)濟(jì)后評(píng)價(jià)方法研究[J];商業(yè)文化(下半月);2012年12期
7 朱明琪;張卓然;周航;;基于模糊數(shù)學(xué)的光伏發(fā)電綜合效益評(píng)價(jià)[J];科技風(fēng);2011年11期
8 楊丹輝;李紅莉;;基于損害和成本的環(huán)境污染損失核算——以山東省為例[J];中國(guó)工業(yè)經(jīng)濟(jì);2010年07期
9 谷永剛;王琨;張波;;分布式發(fā)電技術(shù)及其應(yīng)用現(xiàn)狀[J];電網(wǎng)與清潔能源;2010年06期
10 趙瑞英;;項(xiàng)目后評(píng)價(jià)研究及應(yīng)用[J];山西財(cái)經(jīng)大學(xué)學(xué)報(bào);2010年S1期
相關(guān)碩士學(xué)位論文 前2條
1 管崇學(xué);發(fā)電項(xiàng)目后評(píng)價(jià)理論與實(shí)證研究[D];華北電力大學(xué)(北京);2009年
2 劉嵐;風(fēng)電工程項(xiàng)目后評(píng)價(jià)指標(biāo)體系與評(píng)價(jià)方法研究[D];華北電力大學(xué)(北京);2008年
,本文編號(hào):2211188
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/2211188.html