天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當前位置:主頁 > 科技論文 > 建筑工程論文 >

基于強化區(qū)間線性規(guī)劃的工程項目模糊多目標均衡優(yōu)化

發(fā)布時間:2018-04-02 19:06

  本文選題:模糊多目標優(yōu)化 切入點:風險水平 出處:《統(tǒng)計與決策》2017年20期


【摘要】:文章考慮工程項目實施過程中的不確定因素,建立工期、成本、質(zhì)量模糊均衡優(yōu)化(FTCQP)模型;運用分解定理、強化區(qū)間線性規(guī)劃(EILP)方法,求出各目標的最優(yōu)值區(qū)間;進一步引入模糊偏好關(guān)系,運用模糊折衷規(guī)劃法,得到FTCQP模型的最優(yōu)模糊折衷解。最后通過案例分析驗證了方法的合理性、有效性和可操作性。
[Abstract]:In this paper, considering the uncertain factors in the implementation of engineering projects, the fuzzy equilibrium optimization model of time limit, cost and quality is established, and the optimal value interval of each target is obtained by using decomposition theorem and strengthening interval linear programming (ILP) method.Furthermore, the fuzzy preference relation is introduced and the optimal fuzzy compromise solution of FTCQP model is obtained by using the fuzzy compromise programming method.Finally, the rationality, validity and maneuverability of the method are verified by case study.
【作者單位】: 西安建筑科技大學土木工程學院;
【基金】:國家自然科學基金資助項目(51408459)
【分類號】:TU712.3;TU72

【相似文獻】

相關(guān)期刊論文 前2條

1 賈鵬;吳鳳平;張麗娜;;基于格序理論的模糊多目標施工方案優(yōu)選[J];項目管理技術(shù);2013年06期

2 殷靜;劉曙光;李志宏;;上海市暴雨的模糊風險評價[J];南水北調(diào)與水利科技;2007年06期

,

本文編號:1701709

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/jianzhugongchenglunwen/1701709.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶92668***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com