本文選題:袖閥管注漿 切入點:深基坑 出處:《施工技術(shù)》2017年S1期
【摘要】:以中鐵三局科技研發(fā)中心工程為背景,針對基坑西側(cè)距離既有建筑物較近的情況,對鄰近既有建筑物一側(cè)基坑加固方案進(jìn)行了研究,介紹了袖閥管注漿加固土體設(shè)計,并對袖閥管注漿加固施工工藝及施工過程中的注意事項進(jìn)行了闡述。得出了在鄰近既有建筑物深基坑工程中,采用袖閥管注漿技術(shù)可有效加固土體,確保既有建筑物不因深基坑施工而遭受破壞。
[Abstract]:Based on the project of Science and Technology Research and Development Center of the third Bureau of China Railway, aiming at the situation that the west side of foundation pit is close to the existing building, the reinforcement scheme of foundation pit on the side of adjacent existing building is studied, and the design of soil reinforcement with sleeve valve pipe grouting is introduced. The construction technology of sleeve valve pipe grouting and the matters needing attention in the construction process are expounded. It is concluded that in the deep foundation pit engineering of adjacent existing buildings, the sleeve valve pipe grouting technology can effectively strengthen the soil mass. Ensure that existing buildings are not damaged by deep foundation pit construction.
【作者單位】: 中鐵三局集團(tuán)建筑安裝工程有限公司;
【分類號】:TU753.8
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 余安;淺談深基坑施工的安全監(jiān)督[J];建筑安全;2003年06期
2 岳菊紅,王海霖;深基坑施工中的監(jiān)測項目及其特點[J];中州煤炭;2003年03期
3 盧一凡;深基坑工程管理淺談[J];長江建設(shè);2004年01期
4 黃宏偉,邊亦海;深基坑工程施工中的風(fēng)險管理[J];地下空間與工程學(xué)報;2005年04期
5 鐘才根;劉慧霞;;深基坑工程風(fēng)險源分析及防范對策[J];建設(shè)監(jiān)理;2005年06期
6 何顯舜;莫振瀚;;淺談深基坑的安全施工[J];四川建材;2006年03期
7 陳芳;黨淑鳳;;深基坑工程環(huán)境安全風(fēng)險的技術(shù)控制[J];安裝;2007年02期
8 王偉;劉征;;上海市區(qū)深基坑工程風(fēng)險管理——上海恒升名邸深基坑工程[J];上海建設(shè)科技;2007年06期
9 陳軍;;風(fēng)險管理理論在深基坑工程中的應(yīng)用[J];安徽建筑;2008年06期
10 楊鵬;;深基坑工程風(fēng)險應(yīng)對策略分析[J];中華建設(shè);2008年12期
相關(guān)會議論文 前10條
1 施振東;;深基坑工程風(fēng)險管理淺析[A];地基基礎(chǔ)工程與錨固注漿技術(shù):2009年地基基礎(chǔ)工程與錨固注漿技術(shù)研討會論文集[C];2009年
2 李,
本文編號:1667230
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/1667230.html