基于ANSYS驗證的曲靖市北城廣場5#樓剪力墻糾偏技術研究
發(fā)布時間:2018-01-30 14:44
本文關鍵詞: 剪力墻偏移 糾偏加固 增大截面法 ANSYS 出處:《昆明理工大學》2017年碩士論文 論文類型:學位論文
【摘要】:本文結合曲靖市北城廣場龍須園一期5#樓地下室剪力墻的糾偏加固項目,介紹了現(xiàn)有的建筑物糾偏技術,包括建筑物偏移的原因、其糾偏的方法、偏移的控制標準、偏移的監(jiān)測以及糾偏設計的步驟及原則。該項目地下室剪力墻發(fā)生偏移的原因是地下室設計需要回填土,不能將剪力墻與首層底板一起澆筑形成一個穩(wěn)定的整體,但采取的模板支撐強度不足,導致剪力墻強化后發(fā)生偏移。針對剪力墻發(fā)生偏移,利用全站儀、激光經緯儀、鋼尺等儀器對現(xiàn)場進行全面檢測,并根據(jù)這些現(xiàn)場檢測及測量到的數(shù)據(jù),使用PKPM建模分析其軸力、平面內外剪力、平面內外彎矩承載力驗算,經過分析,提出增大截面的糾偏加固法。即在偏移剪力墻的一側或兩側植入鋼筋網片,再支模板,然后澆筑自密實混凝土,以此達到增大截面糾偏加固的目的。使用ANSYS有限元軟件分別對剪力墻在未偏移、偏移時、糾偏后三種狀態(tài)下進行仿真模擬,導出剪力墻應力云圖、鋼筋應力云圖和剪力墻位移云圖,對比分析三種狀態(tài)下剪力墻的應力和位移,并與實際糾偏加固工程進行對比分析。最后,歸納總結了全文的研究成果以及不足之處,對類似的施工中產生的糾偏加固工作有一定的借鑒意義。
[Abstract]:Combined with the project of correcting and strengthening the shear wall in the basement of the first stage of Longxuyuan of Beicheng Square in Qujing City, this paper introduces the existing building correction technology, including the cause of the deviation of the building, and the method of correcting the deviation. The control standard of migration, the monitoring of migration and the steps and principles of deviation correction design. The reason for the deviation of the basement shear wall in this project is that the basement design needs backfill. The shear wall and the first floor floor slab can not be poured together to form a stable whole, but the adopted formwork support strength is insufficient, leading to the shear wall after strengthening offset. For the shear wall offset, use the total station instrument. The laser theodolite, steel ruler and other instruments are used to detect the field comprehensively, and according to the data measured in the field, PKPM is used to model and analyze the axial force, the shear force inside and outside the plane. Through the analysis of the load capacity of bending moment in and out of the plane, the method of rectifying and strengthening is put forward, that is, the reinforcement mesh is inserted on one side or two sides of the offset shear wall, then the formwork is supported, and then the self-compacting concrete is poured. ANSYS finite element software is used to simulate the shear wall under the three states of no deviation and deviation, and the stress cloud diagram of the shear wall is derived. The stress cloud diagram of steel bar and the displacement cloud diagram of shear wall are compared and analyzed. Finally, the stress and displacement of shear wall under three states are compared and analyzed with the actual rectifying and strengthening project. This paper summarizes the research results and shortcomings of the paper, which has some reference significance for the similar construction work of rectifying and strengthening.
【學位授予單位】:昆明理工大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:TU94;TU746.3
【參考文獻】
相關期刊論文 前9條
1 齊常軍;喬亞玲;;某剪力墻高層住宅施工過程中剪力墻偏移變形檢測及內力分析[J];工業(yè)建筑;2014年03期
2 程曉偉;王楨;張小兵;;某高層住宅樓傾斜原因及糾傾加固技術研究[J];巖土工程學報;2012年04期
3 張小兵;王楨;程曉偉;;沉降觀測在高層建筑物糾傾工程中的應用[J];鐵道建筑;2011年08期
4 符世衡;劉敬波;;淺談對現(xiàn)澆鋼筋混凝土框架柱偏移的處理[J];林業(yè)科技情報;2008年02期
5 張仲先,張杰,陳義平,李紹進;噴射混凝土在高層建筑剪力墻糾偏加固中的應用[J];鐵道工程學報;2004年04期
6 吳宏偉,徐光明;地基應力解除法糾偏機理的離心模型試驗研究[J];巖土工程學報;2003年03期
7 劉亞蓮,梁志松;建筑物傾斜原因分析和糾偏措施探討[J];四川建筑科學研究;2002年03期
8 陳鋒,劉祖德;建筑物糾偏地基應力解除法的有限元分析[J];土工基礎;2000年03期
9 徐學燕,唐業(yè)清,徐國光,何新東;高層建筑糾傾與加固[J];土木工程學報;1999年04期
相關碩士學位論文 前2條
1 殷和平;軟土地基房屋糾偏研究[D];中國地質大學(北京);2008年
2 呂恒柱;磚石古塔糾偏加固的分析方法與監(jiān)測技術的研究[D];揚州大學;2005年
,本文編號:1476490
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/1476490.html
最近更新
教材專著