基于BIM的綠色建筑工程信息集成機(jī)理研究
本文關(guān)鍵詞:基于BIM的綠色建筑工程信息集成機(jī)理研究 出處:《吉林建筑大學(xué)》2017年碩士論文 論文類型:學(xué)位論文
更多相關(guān)文章: BIM 綠色建筑 全壽命周期 信息集成機(jī)理 熵值分析法
【摘要】:隨著經(jīng)濟(jì)社會(huì)的不斷發(fā)展,資源的過(guò)度消耗和浪費(fèi)使得人們的生存環(huán)境遭到破壞,十八大以來(lái)國(guó)家環(huán)保工作成為政府的重要考核指標(biāo),低碳、環(huán)保、綠色成為人們追求的目標(biāo),社會(huì)物質(zhì)的極大豐富使得人們從以往對(duì)量的需求改變?yōu)閷?duì)更高品質(zhì)的追求。建筑業(yè)作為我國(guó)的支柱產(chǎn)業(yè),在過(guò)去十年的快速發(fā)展中,成為資源和能源的消耗大戶,對(duì)環(huán)境造成了一定的影響,綠色建筑的提出為我國(guó)建筑業(yè)有序發(fā)展提供了保障,同時(shí)也對(duì)建筑業(yè)的發(fā)展提出了更高的要求。近幾年在綠色建筑的實(shí)施發(fā)展過(guò)程中常常出現(xiàn)信息壁壘、信息孤島、失去有效性、專業(yè)協(xié)同性差以及建筑項(xiàng)目的綠色評(píng)估標(biāo)準(zhǔn)不統(tǒng)一等問(wèn)題,嚴(yán)重阻礙了自身的發(fā)展。而B(niǎo)IM的出現(xiàn)為綠色建筑的發(fā)展提供了有效保障,信息互用、信息協(xié)同正是其核心價(jià)值所在,所以將BIM技術(shù)與綠色建筑相結(jié)合可以根據(jù)真實(shí)的BIM數(shù)據(jù)和豐富的構(gòu)件參數(shù)信息對(duì)綠色建筑各階段進(jìn)行分析模擬及評(píng)估,以確保數(shù)據(jù)的準(zhǔn)確性和綠色建筑的可持續(xù)性,具有極為重要的意義。首先,本文介紹了國(guó)內(nèi)外關(guān)于BIM應(yīng)用于綠色建筑項(xiàng)目信息集成的研究現(xiàn)狀,及本文的研究?jī)?nèi)容、方法和技術(shù)路線。由于BIM技術(shù)在綠色建筑項(xiàng)目信息集成領(lǐng)域這方面應(yīng)用還極為的不成熟,且沒(méi)有確切統(tǒng)一的官方定義,因此本文結(jié)合國(guó)內(nèi)外的相關(guān)研究重點(diǎn)介紹綠色建筑工程項(xiàng)目的信息集成及BIM技術(shù)的相關(guān)內(nèi)容,并介紹了如何驗(yàn)證BIM應(yīng)用于綠色建筑工程信息集成產(chǎn)生有效作用的方法。其次,本文結(jié)合國(guó)內(nèi)外相關(guān)理論研究及發(fā)展現(xiàn)狀,歸納總結(jié)出綠色建筑工程全壽命周期信息集成的要素以及各階段常常出現(xiàn)的問(wèn)題,繼而詳細(xì)論述BIM技術(shù)應(yīng)用于綠色建筑工程項(xiàng)目信息集成的流程,在此基礎(chǔ)上提出綠色建筑工程信息集成的評(píng)價(jià)指標(biāo)體系并對(duì)各指標(biāo)進(jìn)行特征說(shuō)明。然后從綠色建筑工程全壽命周期的四個(gè)階段出發(fā)分階段式的闡述BIM應(yīng)用于綠色建筑工程項(xiàng)目信息集成的過(guò)程,即說(shuō)明了基于BIM的綠色建筑工程信息集成機(jī)理,并在此基礎(chǔ)上對(duì)BIM在綠色建筑工程信息集成中所產(chǎn)生的有效作用進(jìn)行總結(jié),說(shuō)明了BIM技術(shù)應(yīng)用于綠色建筑工程信息集成的可行性。最后,在BIM對(duì)綠色建筑工程信息集成所產(chǎn)生影響的研究?jī)?nèi)容分析基礎(chǔ)上,引入熵值分析的方法,構(gòu)建出BIM對(duì)綠色建筑工程信息集成是否有效的評(píng)價(jià)模型,以驗(yàn)證BIM應(yīng)用于綠色建筑工程信息集成的有效性。同時(shí)由于我國(guó)BIM技術(shù)的不成熟,加上法制建設(shè)和具體規(guī)范的不完善,本文指出了我國(guó)在應(yīng)用BIM技術(shù)時(shí)可能出現(xiàn)的問(wèn)題,并針對(duì)此問(wèn)題提出個(gè)人的一些相關(guān)看法和意見(jiàn),為BIM技術(shù)在我國(guó)綠色建筑領(lǐng)域的成功應(yīng)用提供借鑒。
[Abstract]:With the development of economy and society, people's living environment has been destroyed by the excessive consumption and waste of resources. Since 18, the national environmental protection work has become an important assessment index of the government, low carbon, environmental protection. Green has become the goal that people pursue, and the great abundance of social material makes people change from the demand for quantity to the pursuit of higher quality. As the pillar industry of our country, the construction industry has been developing rapidly in the past ten years. To become a large consumer of resources and energy, has a certain impact on the environment, the green building for the orderly development of the construction industry to provide a guarantee. At the same time, it also puts forward higher requirements for the development of the construction industry. In recent years, information barriers often appear in the process of the implementation and development of green buildings. The problems of poor professional synergy and inconsistent green evaluation standards of construction projects have seriously hindered the development of their own. However, the emergence of BIM has provided an effective guarantee for the development of green buildings and the mutual use of information. Information collaboration is its core value, so combining BIM technology with green building can be based on real BIM data and abundant component parameter information to analyze, simulate and evaluate each stage of green building. In order to ensure the accuracy of data and the sustainability of green building, it is of great significance. Firstly, this paper introduces the research status of BIM application in green building project information integration at home and abroad. And the research content, method and technical route of this paper. Because of the BIM technology in the green building project information integration domain this aspect application is also extremely immature, and does not have the exact unified official definition. Therefore, this paper focuses on the information integration of green building project and the related content of BIM technology combined with the related research at home and abroad. And introduced how to verify the BIM application in green building engineering information integration to produce effective methods. Secondly, this paper combined with the domestic and foreign related theoretical research and development status. This paper sums up the elements of the information integration of the whole life cycle of green building engineering and the problems that often appear in each stage, and then discusses in detail the process of the application of BIM technology in the information integration of the green building project. On the basis of this, the evaluation index system of green building engineering information integration is put forward and the characteristics of each index are explained. Then the application of BIM in the whole life cycle of green building engineering is described in terms of the four stages of the whole life cycle of the green building project. The process of information integration of green building project. This paper explains the information integration mechanism of green building engineering based on BIM, and summarizes the effective function of BIM in the information integration of green building engineering. This paper explains the feasibility of applying BIM technology to the information integration of green building engineering. Finally, based on the analysis of the influence of BIM on the information integration of green building engineering, the method of entropy analysis is introduced. In order to verify the effectiveness of BIM in green building engineering information integration, an evaluation model is constructed to verify the effectiveness of BIM application in green building engineering information integration. At the same time, due to the immature BIM technology in China. In addition, the construction of legal system and the imperfection of specific norms, this paper points out the possible problems in the application of BIM technology in China, and puts forward some personal views and opinions in view of this problem. It provides reference for the successful application of BIM technology in the field of green building in China.
【學(xué)位授予單位】:吉林建筑大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TU17;TU201.5
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;BIM打造世博會(huì)中的“和諧城市”[J];土木建筑工程信息技術(shù);2010年01期
2 宮仁;;中國(guó)BIM標(biāo)委會(huì) BIM標(biāo)準(zhǔn)組成立[J];建筑工人;2013年07期
3 丁順;;基于BIM技術(shù)的創(chuàng)新思維——“外灘國(guó)際金融中心”國(guó)際概念方案競(jìng)賽[J];建筑技藝;2011年Z1期
4 張金乾;;基于BIM綠色建筑解決方案[J];中國(guó)建設(shè)信息;2012年20期
5 于巧稚;;江蘇大劇院大放異彩,BIM技術(shù)造就水韻江蘇[J];中國(guó)建設(shè)信息;2014年04期
6 劉曉光;;BIM技術(shù)在計(jì)算機(jī)輔助建筑設(shè)計(jì)中的應(yīng)用[J];計(jì)算機(jī)光盤(pán)軟件與應(yīng)用;2014年10期
7 張成方;李超;;BIM技術(shù)在地鐵施工安全方面的應(yīng)用淺析[J];河南科技;2013年09期
8 ;中國(guó)鐵路BIM聯(lián)盟成立[J];鐵道建筑;2014年02期
9 ;BIM引發(fā)建筑行業(yè)巨大變革[J];21世紀(jì)建筑材料居業(yè);2011年10期
10 本刊編輯部;;讓BIM融入建筑,讓綠色深入生活[J];中國(guó)建設(shè)信息;2012年08期
相關(guān)會(huì)議論文 前10條
1 何關(guān)培;;建立企業(yè)級(jí)BIM生產(chǎn)力需要哪些BIM專業(yè)應(yīng)用人才?[A];BIM與工程建設(shè)信息化——第三屆工程建設(shè)計(jì)算機(jī)應(yīng)用創(chuàng)新論壇論文集[C];2011年
2 滑令;韓寧;郝治邦;;BIM管理與職業(yè)道德的重要性[A];2014年3月建筑科技與管理學(xué)術(shù)交流會(huì)論文集[C];2014年
3 魏群;尹偉波;劉尚蔚;;BIM技術(shù)中的數(shù)字圖形信息融合集成系統(tǒng)研究進(jìn)展[A];鋼結(jié)構(gòu)技術(shù)與工程應(yīng)用最新進(jìn)展——2014中國(guó)建筑金屬結(jié)構(gòu)協(xié)會(huì)鋼結(jié)構(gòu)分會(huì)年會(huì)和建筑鋼結(jié)構(gòu)專家委員會(huì)學(xué)術(shù)年會(huì)論文集[C];2014年
4 張樺;;集團(tuán)型設(shè)計(jì)企業(yè)BIM發(fā)展趨勢(shì)與展望[A];BIM與工程建設(shè)信息化——第三屆工程建設(shè)計(jì)算機(jī)應(yīng)用創(chuàng)新論壇報(bào)告集[C];2011年
5 吳寶榮;;基于BIM技術(shù)水處理構(gòu)筑物建模[A];工程設(shè)計(jì)與計(jì)算機(jī)技術(shù):第十五屆全國(guó)工程設(shè)計(jì)計(jì)算機(jī)應(yīng)用學(xué)術(shù)會(huì)議論文集[C];2010年
6 趙志安;;基于BIM概念的管道綜合碰撞檢查軟件[A];BIM與工程建設(shè)信息化——第三屆工程建設(shè)計(jì)算機(jī)應(yīng)用創(chuàng)新論壇論文集[C];2011年
7 程淑珍;;BIM技術(shù)在成功大廣場(chǎng)項(xiàng)目中的應(yīng)用[A];信息化推動(dòng)工程建設(shè)工業(yè)化——第四屆工程建設(shè)計(jì)算機(jī)應(yīng)用創(chuàng)新論壇論文集[C];2013年
8 余敏;廖小梅;馬志貴;顧玲;牛挺;;Bim基因及GR基因表達(dá)與特發(fā)性血小板減少性紫癜糖皮質(zhì)激素抵抗相關(guān)性的研究[A];第13屆全國(guó)實(shí)驗(yàn)血液學(xué)會(huì)議論文摘要[C];2011年
9 余敏;廖小梅;楊金榮;鄧承祺;牛挺;;Bim基因及GR基因表達(dá)與特發(fā)性血小板減少性紫癜糖皮質(zhì)激素抵抗相關(guān)性的研究[A];中華醫(yī)學(xué)會(huì)血液學(xué)分會(huì)第十三屆全國(guó)血栓與止血學(xué)術(shù)會(huì)議暨“血栓栓塞性疾。ㄑㄅc止血)基礎(chǔ)與臨床研究進(jìn)展”論文摘要匯編及學(xué)習(xí)班講義[C];2011年
10 馮延力;;鴻業(yè)科技BIM系列軟件的研發(fā)之路[A];信息化推動(dòng)工程建設(shè)工業(yè)化——第四屆工程建設(shè)計(jì)算機(jī)應(yīng)用創(chuàng)新論壇論文集[C];2013年
相關(guān)重要報(bào)紙文章 前10條
1 本報(bào)記者 蘇艷蕾;從無(wú)序到有序 標(biāo)準(zhǔn)建設(shè)將加速BIM推廣[N];中華建筑報(bào);2013年
2 上海魯班企業(yè)管理咨詢有限公司首席顧問(wèn) 楊寶明 博士;“BIM技術(shù)員”——項(xiàng)目部新大員[N];建筑時(shí)報(bào);2009年
3 何關(guān)培;BIM:是企業(yè)的戰(zhàn)術(shù)工具還是戰(zhàn)略系統(tǒng)[N];建筑時(shí)報(bào);2013年
4 本報(bào)記者 姜姝;BIM應(yīng)用:奠定智慧建筑基礎(chǔ)的軟力量[N];中國(guó)信息化周報(bào);2013年
5 本報(bào)記者 焦玲玲;魏來(lái):BIM國(guó)家標(biāo)準(zhǔn)指明行業(yè)發(fā)展方向[N];中國(guó)房地產(chǎn)報(bào);2013年
6 赫麗萍;設(shè)計(jì)可“行” BIM先“行”[N];中華建筑報(bào);2008年
7 本報(bào)記者 時(shí)宜;BIM標(biāo)準(zhǔn):國(guó)際視野助力本土化落地[N];中國(guó)建設(shè)報(bào);2013年
8 記者 張高青;2011“新立方”建筑文化論壇專題研討B(tài)IM應(yīng)用[N];建筑時(shí)報(bào);2011年
9 金雨暉;BIM是建筑行業(yè)的“藍(lán)海”[N];建筑時(shí)報(bào);2011年
10 石一久;BIM理念滲入工業(yè)變革[N];中國(guó)石化報(bào);2013年
相關(guān)碩士學(xué)位論文 前10條
1 肖保存;基于BIM技術(shù)的住宅工業(yè)化應(yīng)用研究[D];青島理工大學(xué);2015年
2 張忻;BIM在高架橋管養(yǎng)項(xiàng)目中的應(yīng)用[D];西南交通大學(xué);2015年
3 王彥;基于BIM的施工過(guò)程質(zhì)量控制研究[D];江西理工大學(xué);2015年
4 潘刃;BIM技術(shù)在辦公建筑設(shè)計(jì)及物業(yè)管理中的應(yīng)用研究[D];廣西大學(xué);2015年
5 王國(guó)強(qiáng);基于BIM的承包商成本管理研究[D];中國(guó)礦業(yè)大學(xué);2015年
6 周琳;基于BIM的低層無(wú)梁柱板式輕鋼房屋性能研究[D];哈爾濱工業(yè)大學(xué);2014年
7 劉暢;基于BIM技術(shù)的YK項(xiàng)目設(shè)計(jì)質(zhì)量管理研究[D];華南理工大學(xué);2015年
8 李果;應(yīng)用BIM技術(shù)提升工程項(xiàng)目?jī)r(jià)值的機(jī)理研究[D];昆明理工大學(xué);2015年
9 趙金龍;BIM技術(shù)在鋼結(jié)構(gòu)工程建設(shè)階段的應(yīng)用[D];長(zhǎng)春工程學(xué)院;2016年
10 陳杰;基于BIM技術(shù)的室外作業(yè)場(chǎng)地照明模擬與校核研究[D];重慶大學(xué);2015年
,本文編號(hào):1384976
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/1384976.html