天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 管理論文 > 會展論文 >

BIM技術(shù)在北京雁棲湖國際會展中心工程中的應(yīng)用

發(fā)布時間:2018-05-03 16:10

  本文選題:BIM + 三維模型; 參考:《建筑技術(shù)》2016年08期


【摘要】:北京雁棲湖國際會展中心總建筑面積79000m~2,高32m,工程結(jié)構(gòu)實體工程量大,空間造型復(fù)雜,且多部位、多單位、多工種同時施工,施工難度大。通過BIM平臺進行三維建模,分專業(yè)深化設(shè)計,勘誤工程量計算,信息化管理現(xiàn)場施工資料,提升了精細化管理水平,實現(xiàn)了技術(shù)創(chuàng)效。
[Abstract]:The total building area of Beijing Yan Qi Lake International Exhibition Center is 79000m~2, high 32m. The construction of engineering structure is large and the space modeling is complex, and the construction of multi parts, multi units and multi types of construction is difficult. Through the BIM platform, the three-dimensional modeling is carried out, the professional deepening design, the calculation of the Corrigendum engineering, the information management field construction materials, and the promotion of the essence. The level of management is refined, and the effect of technology is achieved.

【作者單位】: 北京建工土木工程有限公司;北京建工集團有限責(zé)任公司;
【分類號】:TU71;TU17

【相似文獻】

相關(guān)期刊論文 前10條

1 練賢榮;曹偉良;尚文紅;馬臣杰;;京基金融中心施工模擬分析[J];建筑結(jié)構(gòu);2011年S1期

2 林歡;;矩陣遞推法在高層框架施工模擬計算中的應(yīng)用[J];建筑結(jié)構(gòu);1989年01期

3 袁政強;梁建忠;張守筠;;柱長修正方法的施工模擬程序設(shè)計實現(xiàn)[J];重慶大學(xué)學(xué)報;2010年10期

4 彭禮;王偉;李建宏;;杭州國際會議中心施工模擬分析[J];結(jié)構(gòu)工程師;2010年06期

5 方朔;趙昕;郁冰泉;伍小平;;考慮非彈性變形的建筑結(jié)構(gòu)施工模擬研究[J];建筑結(jié)構(gòu);2013年S1期

6 劉鑫;劉偉慶;王曙光;杜東升;;高層混合結(jié)構(gòu)基于模型分析的施工模擬方法[J];建筑結(jié)構(gòu);2013年05期

7 方永明,韋承基,戴國瑩;高層建筑結(jié)構(gòu)施工模擬分析的剖析[J];上海鐵道大學(xué)學(xué)報;1997年04期

8 程媛;張偉才;李金果;;某懸掛結(jié)構(gòu)施工模擬分析[J];工程建設(shè)與設(shè)計;2012年06期

9 牛r,

本文編號:1839179


資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/huizhanguanlilunwen/1839179.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶d9604***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com